My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-417-2of2
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-417-2of2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:32:45 PM
Creation date
9/30/2015 10:24:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/12/2006
Control Number
2006-417
Agenda Item Number
11.I.1.
Entity Name
Kimley-Horn Associates, Inc.
Subject
Oslo Road (CR 606) Phase I, Road Widening
Project Number
9705C
Supplemental fields
SmeadsoftID
5987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement (subject to the provisions of paragraph 11 .03 in the Solid Waste Disposal Act (42 USC Section 6903) as <br /> the case of Unit Price Work). amended from time to time. <br /> 14. Contract Times--The number of days or the 25. Laws and Regulations; Laws or Regulations-- <br /> dates stated in the Agreement to: (i) achieve Substantial Any and all applicable laws, rules, regulations, ordinances, <br /> Completion; and (ii) complete the Work so that it is ready codes, and orders of any and all governmental bodies, <br /> for final payment as evidenced by ENGINEER's written agencies, authorities, and courts having jurisdiction. <br /> recommendation of final payment. <br /> 26. Liens--Charges, security interests, or <br /> 15 . CONTRACTOR—The individual or entity with encumbrances upon Project funds, real property, or personal <br /> whom OWNER has entered into the Agreement. property. <br /> 16. Cost of the Work--See paragraph I LOLA for 27. Milestone--A principal event specified in the <br /> definition. Contract Documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the <br /> 17. Drawings--That part of the Contract Work. <br /> Documents prepared or approved by ENGINEER which <br /> graphically shows the scope, extent, and character of the 28. Notice of Award--The written notice by <br /> Work to be performed by CONTRACTOR. Shop OWNER to the apparent successful bidder stating that upon <br /> Drawings and other CONTRACTOR submittals are not timely compliance by the apparent successful bidder with <br /> Drawings as so defined. the conditions precedent listed therein, OWNER will sign <br /> and deliver the Agreement. <br /> 18. Effective Date of the Agreement--The date <br /> indicated in the Agreement on which it becomes effective, 29. Notice to Proceed--A written notice given by <br /> but if no such date is indicated, it means the date on which OWNER to CONTRACTOR fixing the date on which the <br /> the Agreement is signed and delivered by the last of the two Contract Times will commence to run and on which <br /> parties to sign and deliver. CONTRACTOR shall start to perform the Work under the <br /> Contract Documents. <br /> 19. ENGINEER—The individual or entity named <br /> as such in the Agreement. 30. OWNER--The individual, entity, public body, <br /> or authority with whom CONTRACTOR has entered into <br /> 20. ENGINEER 's Consultant--An individual or the Agreement and for whom the Work is to be perforated. <br /> entity having a contract with ENGINEER to famish <br /> services as ENGINEER's independent professional 31 . Partial Utilization--Use by OWNER of a <br /> associate or consultant with respect to the Project and who substantially completed part of the Work for the purpose for <br /> is identified as such in the Supplementary Conditions. which it is intended (or a related purpose) prior to <br /> Substantial Completion of all the Work. <br /> 21 . Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the Work but 32. PCBs--Polychlorinated biphenyls. <br /> which does not involve a change in the Contract Price or the <br /> Contract Times. 33. Petroleum--Petrole <br /> um, including crude oil or <br /> any fraction thereof which is liquid at standard conditions of <br /> 22 . General Requirements--Sections of Division temperature and pressure (60 degrees Fahrenheit and 14.7 <br /> 1 of the Specifications. The General Requirements pertain pounds per square inch absolute), such as oil, petroleum, <br /> to all sections of the Specifications. fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil <br /> mixed with other non-Hazardous Waste and crude oils. <br /> 23 . Hazardous Environmental Condition--The <br /> presence at the Site of Asbestos, PCBs, Petroleum, 34. Project--The total construction of which the <br /> Hazardous Waste, or Radioactive Material in such Work to be perforated under the Contract Documents may <br /> quantities or circumstances that may present a substantial be the whole, or a part as may be indicated elsewhere in the <br /> danger to persons or property exposed thereto in connection Contract Documents. <br /> with the Work. <br /> 35. Project Manual--The bound documentary <br /> 24. Hazardous Waste--The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section 1004 of Work. A listing of the contents of the Project Manual, <br /> 00700 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.