Laserfiche WebLink
CAPACITY CHARGE <br /> Water - Per ERU <br /> Water Treatment S 320. 00 <br /> Water Transmission S 980. 00 <br /> Total S11300000 <br /> Sewer - Per ERU <br /> Wastewater Treatment 521087. 00 <br /> Wastewater Transmission S 709 . 00 <br /> Total 521796. 00 <br /> Line Extension Charges <br /> Main Extension - Water <br /> Per foot measured along front of property served. 511 . 25 <br /> Main Extension Sewer and Sewer Laterals <br /> Per foot measured along front of property served. 515. 77 <br /> (Note : Charge doubles if service available on one side only, <br /> minimum of 50 feet per ERU , maximum of 100 feet per ERU) <br /> OTHER CHARGES <br /> Deposits - Required Upon Opening , Transferrine or Reconnecting Service <br /> Residential and Commercial - Per ERU S50, 00 <br /> Hydrant Meter 5345 . 00 <br /> Interest Rate paid on Deposits . 00208 % per month <br /> 2 . 5 % per year <br /> Charge for Returned Check S20. 00 <br /> Issuance of Duplicate Bill S 1 . 50 <br /> Sewer Tap Cost plus werhead <br /> Meter Replacement <br /> 5/8 Inch S100 , 00 <br /> 1 Inch S 125. 00 <br /> 1 -112 Inch 5300. 00 <br /> 2 Inch or larger Cost plus vcrhead <br /> Meter Removal <br /> 5/8 Inch S30. 00 <br /> 1 Inch S30. 00 <br /> 11 /2 Inch and larger S 40. 00 <br /> Water Service Connection <br /> 5/8 Inch Meter 5400. 00 <br /> 1 Inch Meter 5460. 00 <br /> 1 - 112 Inch Metcr 5810. 00 <br /> Larger than 1412 Inch Meter Cost plus overhead <br /> 3 <br />