My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-238f
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-238f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 9:56:26 AM
Creation date
9/30/2015 8:56:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2005
Control Number
2005-238F
Agenda Item Number
7.EE.
Entity Name
St. Johns River Water Management District
Subject
Alternate Water Supply- Cost sharing program
Contract #S1341AA
Supplemental fields
SmeadsoftID
5054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF WATER AND SEWER RATES, FEES AND CHARGES <br /> Sewer Service Connection <br /> Residential S500. 00 <br /> Commercial and Other Cost plus overhead <br /> Paved Road Cuts Cost plus overhead <br /> (5200 minimum) <br /> Road Jacking and Boring Cost plus overhead <br /> 0200. 00 rr inimum) <br /> Grass Restoration Cost plus verhead <br /> Unauthorized use of Fire Hydrants 5115 . 00 <br /> Other and Eitraordinary Services Cost plus verhead <br /> Meter Installation <br /> 5/8 Inch Meter S130 . 00 <br /> 1 Inch Meter 5250. 00 <br /> 1412 Inch Meter 5500. 00 <br /> 2 Inch Meter Cost plus overhead <br /> 3 Inch Meter and larger Cost plus overhead <br /> Fire Hydrant Meter S25 , 00 <br /> Water Service Reconnection <br /> During Working Hours 525. 00 <br /> After Working Hours 535 . 00 <br /> Meter Rereads and Leak Inspection 520. 00 <br /> Delinquency Charge 52 . 00 plu 1 . 5 % per <br /> month <br /> Genera ► Service Calls Cost plus overhead <br /> Meter Test <br /> 518 Inch Meter 525 . 00 <br /> 1 Inch Meter 525. 00 <br /> 1 - 112 Inch Meter or larger Cost plus overhead <br /> Damage Repair Cost plus overhead <br /> Line Location Cost plus overhead <br /> Eneineerine Services <br /> Site Plan Review - Under 40 Units and Without Lift Station Cost plus : overhead <br /> (550. 00 inimum) <br /> Site Plan Review - Cn•er 40 Units and With Lift Station Cost per overhead <br /> (S 150. 00 minimum) <br /> Inspection Fee : ( <br /> Water Per Connection S 25. 00 50. 00 after hours) <br /> Sewer Per Connection S 25. 00 ( S50. 00 after hours) <br /> Hydrant Flow Test S 60. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.