equal, Style- cast satin finish aluminum, Font- Univers 67, Mount- Projected Spacer Mount- <br /> PSM. Note : The Sign Schedule on page 10440-5 has the Storage Bay and Maintenance <br /> Building labeled in reverse. A corrected page 10440-5 is herewith provided as revised 27 April <br /> 2009. <br /> Item #28 : Specifications Section 13122 : Article 2. 09 (C) Note : No metal or steel members on this project <br /> require spray on fire protection. <br /> Item #29 : Specifications Section 05030- Page 05030- 1 has been replaced with the (Revised 27 April <br /> 2009) sheet attached. <br /> Item #30 : Table of Contents : A revised page of the Table of Contents with Divisions 4 through 9 is <br /> attached to replace the original page issued. A revised page of the Table of Contents (Sections <br /> 16120 through 16965) is attached to replace the original page issued (Sections 16120 through <br /> 16511 ). <br /> Item #31 : Specification Section 07160-Underslab Vapor Retarder: Under Article 2 .01 , Manufacturer; An <br /> approved additional Manufacturer is "Viper" Products. Model VaporCheck II, 15-mil Under <br /> Slab Vapor Barrier, meeting ASTM E 1745 , Class-A, installed in strict compliance with <br /> manufacturer' s instructions. Representative is www.insulationsolutions .com. <br /> Item #32 : Location of Power Transformer: The serving electric utility has yet to establish a transformer <br /> location. Given there is an overhead line across the front of the building and it is to remain, an <br /> overhead transformer bank with a riser and service lateral to the meter socket would be the most <br /> economical choice for the office and maintenance buildings. This will be our recommendation <br /> to the Utility Company. Due to distance, and no need for three phase service, the storage bay <br /> building has it' s own service. The design assumes that a single phase padmounted transformer <br /> would be set 4 foot away from the existing meter socket location on the south wall of the <br /> building. Two (2) concrete filled, 6 inch diameter, steel protection posts with high visibility <br /> yellow vinyl covers will be required. The footprint of the contractor supplied transformer pad is <br /> 4 ' X 4 ' X 4 inches thick, reinforced with frbermesh. Alternatively, if the service-lateral would <br /> be less than 300 feet in length, an overhead transformer on a pole line would suffice. For <br /> bidding purposes utilize the transformer pad option. <br /> Item #33 : Specification for Fire Detection and Alarm System: Section 16965- See attached specification <br /> section that applies to this project. <br /> Item #34 : Generator Transfer Switch : The MTS is a manual Transfer Switch and shall be 2 Pole in lieu of <br /> the 3 Pole as shown on the plans Sheet E-6, Building Riser Diagram. A 60kw Generator Set <br /> shall be installed by the Contractor. <br /> Item #35: Electrical Conduit: Conduits approved for use on this project are specified in Notes 12, 13 , and <br /> 14 of Sheet E- 1 . MC Cable shall only be used in locations where it is readily replaceable. This <br /> condition shall exclude it' s use in the Administration Building, where the replacement of MC <br /> cable would disrupt operations and/or require restoration work. <br /> - 5 — <br /> F:IEngineeringl Capital Projectsl0701 IRCPARXS COMPLEXIAddendums1IRC Parks Maintenance Complex Addendum #1.doc <br />