Laserfiche WebLink
Corner Guards shall be 40" high as manufactured by Acrovyn, or equal, SSM- 10/20 color 920 <br /> almond. Carpet shall be manufactured by Shaw, or equal, style Reflections III, color 58310 <br /> Botanical View, pattern loop, 64% yam dyed, 36% solution dyed, primary backing synthetic, <br /> secondary backing ActionBac, 10 .0 stitches per inch, production yarn weight 26.0 oz/sq yd, 10 <br /> year limited warranty, glue down with manufacturer' s approved adhesives, no pad. Adhere to <br /> this spec in lieu of Section 09680, 1 .06, B . Vinyl Base style and color per Sheet A-4 finish <br /> schedule notes and in roll stock only. Provide black vinyl transition strips where tile and carpet <br /> abut in open areas. At door openings provide a 3 " deep aluminum saddle to conceal the carpet <br /> to tile joint. <br /> Item #46 : Specification Section 16750 : Article 3 . 1 , (B), shall utilize UTP Category 5 cable . Delete the <br /> number [3 ] . <br /> Item #47: Painting Clarification: Section 09900, page 7, item P . "Armourcoat Duturo" is only required <br /> "when scheduled on the Finish Schedule". Since it is not called out on the Finish Schedule, <br /> none is required. Utilize standard Eggshell finish as called out in 1 . 13 , item B, Interior Drywall. <br /> Item #48 : Temporary Chain Link Fencing : per specifications section 1500, 2 . 13 . Temporary fencing is not <br /> shown on any site plans or building plans. Sheet C-2 depicts permanent fencing per <br /> specifications section 02821 . To satisfy the Bid Schedule lump sum amount for temporary <br /> construction fencing, use 1 ,320 linear feet of temporary construction fencing including two (2) <br /> twelve foot clear width lockable gates. Location of fencing and gates to be submitted to the <br /> Owner and Architect for approval, prior to placement. <br /> Item #49 : Finish Selections for Floor and Walls in Administrative and Storage Bay Buildings: The <br /> following shall be provided- Wall Ceramic Tile shall be Dal Tile, or equal , 4" X 4" Matte <br /> Urban Putty 0761 with cove tile base and bullnose tile at top of wainscot. Wall grout to be <br /> Laticrete, or equal, 44 bright white. Floor Porcelain Tile in Hallways ( 19), (20), Reception <br /> Area ( 1 ), Breakroom (4), File Storage Room ( 16), and Exit Corridor (22) shall be Crossville <br /> Ceramics, or equal, 12" X 12", mountain stone series AV31 , cascade. Floor tile grout Laticrete, <br /> or equal, color 40 Latte. Floor Porcelain Tile in all bathrooms, toilet rooms and dressing rooms <br /> shall be Dal Tile, or equal, 12" X 12" Continental Slate Porcelain, Brazilian Green CS52 . Floor <br /> tile grout Laticrete, or equal, color 35 mocha. All floor tile to be 90 degree to walls installation. <br /> Corner Guards shall be 40" high as manufactured by Acrovyn, or equal , SSM- 10/20 color 920 <br /> almond. Carpet shall be manufactured by Shaw, or equal, style Reflections III, color 58310 <br /> Botanical View, pattern loop, 64% yarn dyed, 36% solution dyed, primary backing synthetic, <br /> secondary backing ActionBac, 10.0 stitches per inch, production yam weight 26.0 oz/sq yd, 10 <br /> year limited warranty, glue down with manufacturer' s approved adhesives, no pad. Adhere to <br /> this spec in lieu of Section 09680, 1 .06, B . Vinyl Base style and color per Sheet A-4 finish <br /> schedule notes and in roll stock only. Provide black vinyl transition strips where tile and carpet <br /> abut in open areas. At door openings provide a 3" deep aluminum saddle to conceal the carpet <br /> to tile joint. <br /> Item #50 : Specification Section 16750 : Article 3 . 1 , (B), shall utilize UTP Category 5 cable. Delete the <br /> number [3] . <br /> - 7 — <br /> F:IEngineeringiCapital Projects10701 IRC PARKS COMPLEXIAddendums1IRC Parks Maintenance Complex Addendum #2.doc <br />