Item #36: Lighting Fixture `B" - Note for Clarification: This fixture is used in all three buildings. Per the <br /> Light Fixture Schedule on Sheet E-7, this fixture is chain suspended in the Administration <br /> Building and Wall Mounted in the Maintenance and Storage Bays . <br /> Item #37: Phone Service Feed: The exact location of the phone service feed has yet to be determined. For <br /> purposes of the bid, provide two (2), 2 inch Schedule 40 conduits from the power pole located <br /> just east of the west exit to the north wall of the Administration Building and roughed into the <br /> Electric/Phone room terminated and dust capped below the phone board. <br /> Item #38: Generator Day Tank: If the tank and piping contractor can assure the operation of the generator <br /> being directly fed from the main 550 gallon tank, with adequate fuel draw from the generator <br /> fuel pump, then the day tank can be eliminated. Location of the generator and fuel tank shall be <br /> per the Civil Plan in lieu of Sheet F- 1 location. <br /> Item #39: Metal Building Manufacturer: One additional approved metal building manufacturer that meets <br /> the requirements of Specification Section 13122 and membership in the MBMA is 1 ) Nucor <br /> Building Systems Group. <br /> Item #40 : Fire Sprinklers : No Fire Sprinklers are required for these three buildings. <br /> Item #41 : Sheet A- 14 Detail 7/A- 14: This detail refers you to Sheet A- 12 which is incorrect. The <br /> reference should be on Sheet A- 14 and is a section through the storage cabinet per E/A- 14. This <br /> shelf unit is located in the Administration Building at the closet by the northeast exit door. <br /> Item #42 : Specifications Section 09655 — Vinyl Transition Moulding: This section is attached. It appears <br /> on the Table of Contents but was not included with the original issue documents. <br /> Item #43 : Painting Clarification: Section 09900, page 7, item P . "Armourcoat Duturo" is only required <br /> "when scheduled on the Finish Schedule". Since it is not called out on the Finish Schedule, <br /> none is required. Utilize standard Eggshell finish as called out in 1 . 13 , item B, Interior Drywall. <br /> Item #44: Temporary Chain Link Fencing: per specifications section 1500, 2 . 13 . Temporary fencing is not <br /> shown on any site plans or building plans . Sheet C-2 depicts permanent fencing per <br /> specifications section 02821 . To satisfy the Bid Schedule lump sum amount for temporary <br /> construction fencing, use 1 ,320 linear feet of temporary construction fencing including two (2) <br /> twelve foot clear width lockable gates. Location of fencing and gates to be submitted to the <br /> Owner and Architect for approval, prior to placement. <br /> Item #45 : Finish Selections for Floor and Walls in Administrative and Storage Bay Buildings : The <br /> following shall be provided- Wall Ceramic Tile shall be Dal Tile, or equal, 4" X 4" Matte <br /> Urban Putty 0761 with cove tile base and bullnose tile at top of wainscot. Wall grout to be <br /> Laticrete, or equal, 44 bright white. Floor Porcelain Tile in Hallways ( 19), (20), Reception <br /> Area ( 1 ), Breakroom (4), File Storage Room ( 16), and Exit Corridor (22) shall be Crossville <br /> Ceramics, or equal, 12" X 12", mountain stone series AV31 , cascade. Floor tile grout Laticrete, <br /> or equal, color 40 Latte. Floor Porcelain Tile in all bathrooms, toilet rooms and dressing rooms <br /> shall be Dal Tile, or equal, 12" X 12" Continental Slate Porcelain, Brazilian Green CS52. Floor <br /> tile grout Laticrete, or equal , color 35 mocha. All floor tile to be 90 degree to walls installation. <br /> - 6 — <br /> F:IEngineeringl Capital Projects10701 IRC PARKS COMPLEXIAddendumsURC Parks Maintenance Complex Addendum #ddoc <br />