My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #36: Lighting Fixture `B" - Note for Clarification: This fixture is used in all three buildings. Per the <br /> Light Fixture Schedule on Sheet E-7, this fixture is chain suspended in the Administration <br /> Building and Wall Mounted in the Maintenance and Storage Bays . <br /> Item #37: Phone Service Feed: The exact location of the phone service feed has yet to be determined. For <br /> purposes of the bid, provide two (2), 2 inch Schedule 40 conduits from the power pole located <br /> just east of the west exit to the north wall of the Administration Building and roughed into the <br /> Electric/Phone room terminated and dust capped below the phone board. <br /> Item #38: Generator Day Tank: If the tank and piping contractor can assure the operation of the generator <br /> being directly fed from the main 550 gallon tank, with adequate fuel draw from the generator <br /> fuel pump, then the day tank can be eliminated. Location of the generator and fuel tank shall be <br /> per the Civil Plan in lieu of Sheet F- 1 location. <br /> Item #39: Metal Building Manufacturer: One additional approved metal building manufacturer that meets <br /> the requirements of Specification Section 13122 and membership in the MBMA is 1 ) Nucor <br /> Building Systems Group. <br /> Item #40 : Fire Sprinklers : No Fire Sprinklers are required for these three buildings. <br /> Item #41 : Sheet A- 14 Detail 7/A- 14: This detail refers you to Sheet A- 12 which is incorrect. The <br /> reference should be on Sheet A- 14 and is a section through the storage cabinet per E/A- 14. This <br /> shelf unit is located in the Administration Building at the closet by the northeast exit door. <br /> Item #42 : Specifications Section 09655 — Vinyl Transition Moulding: This section is attached. It appears <br /> on the Table of Contents but was not included with the original issue documents. <br /> Item #43 : Painting Clarification: Section 09900, page 7, item P . "Armourcoat Duturo" is only required <br /> "when scheduled on the Finish Schedule". Since it is not called out on the Finish Schedule, <br /> none is required. Utilize standard Eggshell finish as called out in 1 . 13 , item B, Interior Drywall. <br /> Item #44: Temporary Chain Link Fencing: per specifications section 1500, 2 . 13 . Temporary fencing is not <br /> shown on any site plans or building plans . Sheet C-2 depicts permanent fencing per <br /> specifications section 02821 . To satisfy the Bid Schedule lump sum amount for temporary <br /> construction fencing, use 1 ,320 linear feet of temporary construction fencing including two (2) <br /> twelve foot clear width lockable gates. Location of fencing and gates to be submitted to the <br /> Owner and Architect for approval, prior to placement. <br /> Item #45 : Finish Selections for Floor and Walls in Administrative and Storage Bay Buildings : The <br /> following shall be provided- Wall Ceramic Tile shall be Dal Tile, or equal, 4" X 4" Matte <br /> Urban Putty 0761 with cove tile base and bullnose tile at top of wainscot. Wall grout to be <br /> Laticrete, or equal, 44 bright white. Floor Porcelain Tile in Hallways ( 19), (20), Reception <br /> Area ( 1 ), Breakroom (4), File Storage Room ( 16), and Exit Corridor (22) shall be Crossville <br /> Ceramics, or equal, 12" X 12", mountain stone series AV31 , cascade. Floor tile grout Laticrete, <br /> or equal, color 40 Latte. Floor Porcelain Tile in all bathrooms, toilet rooms and dressing rooms <br /> shall be Dal Tile, or equal, 12" X 12" Continental Slate Porcelain, Brazilian Green CS52. Floor <br /> tile grout Laticrete, or equal , color 35 mocha. All floor tile to be 90 degree to walls installation. <br /> - 6 — <br /> F:IEngineeringl Capital Projects10701 IRC PARKS COMPLEXIAddendumsURC Parks Maintenance Complex Addendum #ddoc <br />