Laserfiche WebLink
Item #51 : Control Joints: Note for clarification- The casing beads and control joints on all exterior walls <br /> and soffits shall be manufactured by Vinyl Corp, or equal, per the following schedule : <br /> 1 ) 5/8 " stucco - # 1558X for control joints at walls. Has removable zipp strip. <br /> 2) 3/J" stucco - # 1575X for control joint at soffits . Has removable zipp strip . <br /> 3 ) 5/8" stucco - #6658L Long Flange Casing Bead per section A/A- 10 slab to block. <br /> 4) WCJ- wall control joints are structural CMU joints that appear on all three buildings on <br /> Sheets S -2, S-3 , and S-5 , and per the detail of same on Sheet S- 1 . <br /> Item #52 : Birch Doors: shall be stain grade, natural birch, plain sliced. <br /> Item # 53 : Door Hardware Schedule: All locksets shall be per the hardware schedule as stipulated in <br /> 08700, 2 .02(A). Final keying shall be to Owner' s satisfaction. There is no "existing" lock <br /> system that needs to be keyed to match as called oilt in 08700,3 .01 ,(A) . <br /> Item #54: Materials Testing Clarification: The County will pay for the materials testing (soils, concrete, <br /> asphalt etc.) for the site work. All materials testing for the buildings shall be paid for by the <br /> contractor. <br /> Item #55: Taxes Clarification: The Contractor will be responsible for all taxes on the project. The <br /> County has the right, but not the obligation, to direct purchase any item in the amount of <br /> $25 ,000 or greater. <br /> Item #56 : Sheet L-2 : Delete Magnolia Grandflora and add Magnolia Virginiana. Delete Ulmus <br /> Americana and add Ulmus Americana Floridana. <br /> Item #57: Fences Clarification: The Generator Security Fence will not be required. The dumpster chain <br /> link gates should be included in the Dumpster Enclosure Bid Item #26 . <br /> Item #58 : Permits Clarification: The contractor will be responsible for the following permits (at a <br /> minimum) <br /> 1 . 3 IRC Building Permits $4,897. 30 + $300.00 (est.) <br /> 2. 1 NOI FDEP Permit $400 .00 (est. ) <br /> 3 . 1 IRC Well Abandonment Permit $25 .00 (est.) <br /> Item #59: Addendum # 1 Item#5 Clarification — No separate permit will be required for the emergency <br /> generator fuel storage tank and piping from the Indian River County Building Department. <br /> Item #60 : The project is to be bid in the itemized format included in the Project Documents . <br /> Item #61 : The last day for answering questions for this bid is extended to May 13 , 2009. <br /> - 8 — <br /> F.IEngineeringl Capita! Projects)0701 IRC PARKS COMPLEXIAddendums[IRC Parks Maintenance Complex Addendum #2.doc <br />