My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:41:36 AM
Creation date
9/30/2015 11:37:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2009
Control Number
2009-192
Agenda Item Number
8.I.
Entity Name
DeAngelis Diamond Construction
Subject
Contract IRC Parks Maintenance Complex
Area
5500 77th St.
Project Number
0701
Bid Number
2009043
Supplemental fields
SmeadsoftID
6815
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #51 : Control Joints: Note for clarification- The casing beads and control joints on all exterior walls <br /> and soffits shall be manufactured by Vinyl Corp, or equal, per the following schedule : <br /> 1 ) 5/8 " stucco - # 1558X for control joints at walls. Has removable zipp strip. <br /> 2) 3/J" stucco - # 1575X for control joint at soffits . Has removable zipp strip . <br /> 3 ) 5/8" stucco - #6658L Long Flange Casing Bead per section A/A- 10 slab to block. <br /> 4) WCJ- wall control joints are structural CMU joints that appear on all three buildings on <br /> Sheets S -2, S-3 , and S-5 , and per the detail of same on Sheet S- 1 . <br /> Item #52 : Birch Doors: shall be stain grade, natural birch, plain sliced. <br /> Item # 53 : Door Hardware Schedule: All locksets shall be per the hardware schedule as stipulated in <br /> 08700, 2 .02(A). Final keying shall be to Owner' s satisfaction. There is no "existing" lock <br /> system that needs to be keyed to match as called oilt in 08700,3 .01 ,(A) . <br /> Item #54: Materials Testing Clarification: The County will pay for the materials testing (soils, concrete, <br /> asphalt etc.) for the site work. All materials testing for the buildings shall be paid for by the <br /> contractor. <br /> Item #55: Taxes Clarification: The Contractor will be responsible for all taxes on the project. The <br /> County has the right, but not the obligation, to direct purchase any item in the amount of <br /> $25 ,000 or greater. <br /> Item #56 : Sheet L-2 : Delete Magnolia Grandflora and add Magnolia Virginiana. Delete Ulmus <br /> Americana and add Ulmus Americana Floridana. <br /> Item #57: Fences Clarification: The Generator Security Fence will not be required. The dumpster chain <br /> link gates should be included in the Dumpster Enclosure Bid Item #26 . <br /> Item #58 : Permits Clarification: The contractor will be responsible for the following permits (at a <br /> minimum) <br /> 1 . 3 IRC Building Permits $4,897. 30 + $300.00 (est.) <br /> 2. 1 NOI FDEP Permit $400 .00 (est. ) <br /> 3 . 1 IRC Well Abandonment Permit $25 .00 (est.) <br /> Item #59: Addendum # 1 Item#5 Clarification — No separate permit will be required for the emergency <br /> generator fuel storage tank and piping from the Indian River County Building Department. <br /> Item #60 : The project is to be bid in the itemized format included in the Project Documents . <br /> Item #61 : The last day for answering questions for this bid is extended to May 13 , 2009. <br /> - 8 — <br /> F.IEngineeringl Capita! Projects)0701 IRC PARKS COMPLEXIAddendums[IRC Parks Maintenance Complex Addendum #2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.