Laserfiche WebLink
BOARD OF COUNTY COMMISSIONERS <br /> 1840 25th Street, Vero Beach, Florida 32960-3365 <br /> Telephone: (772) 567-8000 <br /> March 26, 2007 <br /> Tara S . Walters <br /> Florida Department of Community Affairs <br /> Division of Housing and Community Development <br /> CDBG/Disaster Recovery, Room 300C <br /> 2555 Shumard Oaks Boulevard <br /> Tallahassee, Florida 323 99-2 100 <br /> RE : Amendment Number Two <br /> Indian River County Disaster Recovery Initiative CDBG <br /> DCA Contract #06DB -3C- 10-40-01 -W14 <br /> Dear Ms. Walters, <br /> Please consider this as a request for an amendment for the above referenced Grant contract <br /> between the Florida Department of Community Affairs and Indian River County (Amendment <br /> 92) . Amendment #2 will accomplish the following: <br /> • Removal of the Rockridge Subdivision Stormwater project from the grant contract. <br /> • Reallocation of $440,695 .00 of the $2, 100,000 in Rockridge Subdivision Stormwater <br /> project funds to the Fire Station #4 project. <br /> • Reallocation of the remaining $ 1 ,659,305 .00 in Rockridge Subdivision Stormwater <br /> project funds to the Rockridge Subdivision Sanitary Sewer project. <br /> • Reallocation of $691 ,599 from the Engineering line item to the Rockridge Subdivision <br /> Sanitary Sewer project. <br /> • Reallocation of $ 175 ,000. 00 of unobligated funds in the West Wabasso Phase I water line <br /> project to address Phase II of the West Wabasso water line project. <br /> • Revision of the beneficiaries in Phase I of the West Wabasso Water Line project to more <br /> accurately reflect the individuals living in the units that were impacted. <br /> The removal of the Rockridge Subdivision Stormwater project from the contract is a result of <br /> delays with obtaining approval of Hazard Mitigation Grant Program (HMGP) funding, problems <br /> finalizing the property on which the storm water pumps could be installed, and intensive <br /> environmental permitting required. In addition, there was an increase in the estimated volume of <br /> water that will have to be diverted to other locations based on the engineering design completed <br /> to date. Because of these issues, the Rockridge Subdivision Stormwater project cannot be <br /> completed within the time remaining in the Disaster Recovery Grant contract. <br />