Laserfiche WebLink
Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST (DERRICO) <br /> Project: IRC — Royal Oak Mobile Home Park Water Service Project <br /> Description : UCP #3082 , WI # 472- 169000- <br /> Date: May 23, 2008 <br /> HD WATERWORKS <br /> LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description uanti Measure Price Price Price Price <br /> 63 Mobilization 1 7% 0.04 $581 .88 <br /> Old Install 8" PVC Water Main 160 LF $ 10.00 $ 1 ,600.00 $6.65 $ 1 ,064.00 <br /> O8a Install MJ Restrained Joints on Existing Main, 3" through 8" 4 EA $400.00 $ 1 ,600.00 $58,54 $234. <br />16 <br /> 17d Install 8" Resilient Seated Gate Valve & Box 4 EA $460.00 $ 1 ,840.00 $920.78 $3,683. 12 <br /> 07 Install MJRDI Fittings 0.5 TONS $ 1 ,665.00 $832.50 $ 1 ,500.00 $750.00 <br /> 22 Potholes 1 <br /> EA $220.00 $220.00 <br /> 25e Install 4" Compound Service Meter I EA $300.00 $300.00 $6,724.43 $6,724.43 <br /> 26c Install 4" Backflow Assembly I EA $600.00 $600.00 $3,095 .82 $3,095.82 <br /> 27a Install Temp. Sample Points 2 <br /> EA $ 100.00 S200.00 $200.86 $401 .72 <br /> 27b Obtain Bact. Sample/Take to Lab 4 EA $200.00 $800.00 <br /> 59a Lawn Restoration (Topsoil & Sod) 160 LF $2.00 $320.00 $ 1 .55 $248.00 <br /> Subtotal Water Facilities $8,312.50 <br /> Total Materials $ 16,201 .25 <br /> Total Labor with Mobilization $8,894.38 <br /> TOTAL PROJECT COS $25,095.63 <br /> Attachment 2 <br />