My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-246
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:17:34 AM
Creation date
10/1/2015 12:27:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
08/12/2008
Control Number
2008-246
Agenda Item Number
12.J.5
Entity Name
Derrico Construction Corp.
Subject
Royal Oak Mobile Home Park Water Meter Project
Area
Royal Oak Mobile Home Park
Project Number
UCP 3082
Supplemental fields
SmeadsoftID
7514
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST (DERRICO) <br /> Project: IRC — Royal Oak Mobile Home Park Water Service Project <br /> Description : UCP #3082 , WI # 472- 169000- <br /> Date: May 23, 2008 <br /> HD WATERWORKS <br /> LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description uanti Measure Price Price Price Price <br /> 63 Mobilization 1 7% 0.04 $581 .88 <br /> Old Install 8" PVC Water Main 160 LF $ 10.00 $ 1 ,600.00 $6.65 $ 1 ,064.00 <br /> O8a Install MJ Restrained Joints on Existing Main, 3" through 8" 4 EA $400.00 $ 1 ,600.00 $58,54 $234. <br />16 <br /> 17d Install 8" Resilient Seated Gate Valve & Box 4 EA $460.00 $ 1 ,840.00 $920.78 $3,683. 12 <br /> 07 Install MJRDI Fittings 0.5 TONS $ 1 ,665.00 $832.50 $ 1 ,500.00 $750.00 <br /> 22 Potholes 1 <br /> EA $220.00 $220.00 <br /> 25e Install 4" Compound Service Meter I EA $300.00 $300.00 $6,724.43 $6,724.43 <br /> 26c Install 4" Backflow Assembly I EA $600.00 $600.00 $3,095 .82 $3,095.82 <br /> 27a Install Temp. Sample Points 2 <br /> EA $ 100.00 S200.00 $200.86 $401 .72 <br /> 27b Obtain Bact. Sample/Take to Lab 4 EA $200.00 $800.00 <br /> 59a Lawn Restoration (Topsoil & Sod) 160 LF $2.00 $320.00 $ 1 .55 $248.00 <br /> Subtotal Water Facilities $8,312.50 <br /> Total Materials $ 16,201 .25 <br /> Total Labor with Mobilization $8,894.38 <br /> TOTAL PROJECT COS $25,095.63 <br /> Attachment 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.