My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-232
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 1:17:10 PM
Creation date
10/1/2015 12:26:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/15/2008
Control Number
2008-232
Agenda Item Number
8.Z.
Entity Name
Dunkelberger Engineering & Testing Inc.
Subject
Work Order No.5 Services Agreement
Powerline Road Construction
Area
Powerline Road
Project Number
0217
Supplemental fields
SmeadsoftID
7499
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
backfill placed. Density testing of pipe backfill will extend from an elevation <br /> corresponding to the invert of the pipe to the subgrade elevation. <br /> • In-place density tests within the stabilized subgrade and base course layers at a frequency <br /> of 1 test for each 200 lineal feet of roadway . <br /> • Sampling, slump testing, molding, transporting, curing, and laboratory testing to <br /> determine the compressive strength of concrete used for headwall construction. <br /> Laboratory Testing <br /> • Perform laboratory moisture-density relationship tests (AASHTO T480 and AASHTO <br /> T-99), sieve analysis, organic content tests, and Atterberg limits determination on the <br /> existing embankment soils and/or fill soils. <br /> • Limerock Bearing Ratio (LBR) tests for stabilized subgrade and base course at a <br /> frequency of 1 test for about each 1000 lineal feet of roadway. <br /> Asphalt Paving& Testing <br /> • Asphalt paving observations by a Level I Asphalt Technician. Technician will verify <br /> thickness, temperature , and mix design tickets during asphalt placement. <br /> • Coring of the asphalt at ten ( 10) locations (a frequency of one ( 1 ) core about every 250 <br /> lineal feet) for subsequent laboratory testing and to verify asphalt and base course <br /> thicknesses. <br /> • Laboratory testing of the asphalt cores to include determination of specific gravity <br /> (density) for each core and extraction/gradation testing on select cores (5 ) . <br /> Engineering & Reporting <br /> • Engineering oversight during the construction to coordinate the aforementioned test <br /> program, make site visits, and attend progress meetings. <br /> • Submittal of brief engineering reports documenting our findings and test results. <br /> All work shall also comply with the current Florida Minimum Technical Standards. <br /> COMPENSATION , <br /> The COUNTY agrees to pay , and the Geotechnical Professional agrees to accept, a fee for <br /> services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A" <br /> Fee Schedule and Man Hours . <br /> A Not-to-Exceed Amount of: $ 13 , 704 to be paid on a unit price basis for actual work performed <br /> in accordance with the schedule of services and fees set forth in Exhibit A of RENEWAL OF <br /> THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO . 0534 WITH <br /> DUNKELBERGER EGINEERING & TESTING . INC . Effective Date : October 1 , 2007 . <br /> CADocuments and SettingAdawnw\Local Settings\Tempomry Internet Files\Content.Outlook\B7MZRA8B\WO# 4 Dunkelberger 07-07-08 Const <br /> Phase Testing.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.