Laserfiche WebLink
• Fort Lauderdale <br /> • Lakeland <br /> engineering1!i testing , Jim • <br /> Port Saint <br /> • Sarasota <br /> www,dunl(elberger-engineering .com • West Palm Beach <br /> Indian River County August 29, 2008 <br /> 180. 1 27'1' Street Project No . PSL- 08 -2558 (BG 11A ) <br /> Vero Beach, 'Florida 32960 <br /> Attention: Mr, Michael D . Nixon, PE. . . . via email <br /> Roadway Production Manager <br /> Subject ; Proposed Geotechnical Services . <br /> Improvements to 53 ` d Street & Old Dixie Highway <br /> Indian River County, Florida <br /> Dear Mr. Nixon. <br /> INTRODUCTION <br /> D inkelberger Engineering & Testing, Inc. (Dunke.lberger) is pleased to submit this proposal for <br /> the above referenced project. Our work scope into complete ai roadway soil survey and structure <br /> investigation generally following the guidelines outlined in the current FDOT Soils and . <br /> Foundation Handbook (2006) . <br /> PROJECT CONSIDERATIONS <br /> The project will involve an. approximately 4 ,000 lineal feet of improvements to 53 'd Street and <br /> 1 ,960 lineal feet of improvements to Old Dixie Righway ui Indian River County, Florida. The <br /> 53'`d Street improvements will begin at the east side of the- Lateral "H" Canal (Station 384+04 .66) <br /> and extend eastward to Indian River Boulevard (Station 424+00) . The section of road extending <br /> from Lateral "H ' Canal to Old Dixie Highway will consist of new 4-lane divided roadway. The <br /> section of existing 24ane roadway extending from Old Dixie Highway to Indian River <br /> Boulevard will be widened from 24ane to to 44ane divided roadway. <br /> Of note is an approximately 1 , 100-foot stretch of the proposed 53d Street between approximately <br /> Station 3 $ 7+00 and Station 398+00 , Anunimproved roadway presently exists along this section <br /> of roadway, with foamer borrow lakes being located on both sides. We understand that it is <br /> uncertain if this section of unimproved roadway was constructed before or after the excavation of <br /> the lakes . The composition of the unimproved roadway embankment is also unknown . The <br /> unknown quality and composition of the embankment fill , combined with the plans to place 6 to <br /> 9' feet of new fill over the existing embankment, poses concern for the construction and long <br /> term performance of the new road. <br /> The Old Dixie Highway improvements will begin approximately 1 ,080 feet south of 53`a Street <br /> (Station 89+47 .58) and extend to approximately 880 feet north of '53 `d Street. The improvements <br /> to Old Dixie Highway will consist of adding turn lanes to thet existing 2-lane roadway. <br /> State of Florida Board of Professional Engineers Authorization No . 6B70 <br /> Toll- Free: (877) 64M832 <br />