My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-275
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 9:54:32 AM
Creation date
10/1/2015 12:33:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/09/2008
Control Number
2008-275
Agenda Item Number
8.W.
Entity Name
Dunkelberger Engineering & Testing
Subject
Work Order No.7 53rd Street Roadway Improvements
Area
53rd Street
Project Number
0107
Supplemental fields
SmeadsoftID
7553
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River Count 0y Page ' 4 <br /> b)Iprot)evIeirts to 53"t Street & Old Dixie Higl wq7 Project h'o. PSL- 08-2558 (BG 11. 4) <br /> Laboratory Testing <br /> 1 . Laboratory examination (classification) of the material samples and physical property <br /> tests of same to establish their plasticity, gradation, organic content , moisture content, <br /> LBR and corrosion potential . Consolidation testing; may be performed on soft <br /> cohesive soils should they be identified in the borings conducted in the unimproved <br /> roadway section. <br /> Reporting <br /> L Preparation and submittal of a report that presents results for the roadway soil survey <br /> and structures investigation as detailed in Chapter 9 of FDOT's Soils and Foundation <br /> Handbook (2006) . The report will address plastic and/or organic soils (limits and <br /> volume), if present, projected water table levels, and design/constiuction options to <br /> deal with plastic/organic soils and perched water (e. g. , medians) . The report will <br /> include cross-sectional profiles of the subsurface conditions with soil classifications. <br /> Our geotechnical budget does not include costs for rental of earth moving equipment to access <br /> heavily vegetated or un-level terrain areas. Our intent will be to adjust the boring locations so as <br /> to avoid. the need for clearing activities. <br /> Where necessary, we assume that access to the roadway aligrunent through private properties <br /> will be coordinated by the County. <br /> We strongly recommend that the �roject surveyor survey the horizontal uric/ vertical positions <br /> of the borings and piezoineters. This data (elevations) is key to establishing cut depths for <br /> unsuitable soils and alae seasonal /high ground;vater levels (elevations). <br /> SCHEDULE <br /> Following receipt of your written authorization to proceed, we estimate that aur schedule for the <br /> geotechnical work will be as follows: <br /> • Projectstart=up, boring layout and utility clearance — 1 week <br /> • Field exploration-2 weeks <br /> • Laboratory testing — 2 -to 3 weeks <br /> • <br /> . Engineering analysis, ,preparation and submittal of draft report — 2 weeks <br /> • Finalize report - 1 week <br /> SCHEDULE TOTAL : 8 to 9 weeks <br /> Dunkelberger <br />
The URL can be used to link to this page
Your browser does not support the video tag.