Laserfiche WebLink
Indian RAYer Cowlty <br />InlProvements. to 5 3"' Street & Old Dixie f11ghivay <br />Page 3 <br />Project No. PSL -08-2558 (BG 11.1) <br />We understand.. that the County will provide a backhoe/trackhoe to perform the test pit <br />excavations, and therefore, costs associated with rental of such equipment have not <br />been included in this proposal <br />Thiii-walled tube soil samples may be obtained during the drilling operations if soft <br />cohesive soils are identified by the borings drilled in the unimproved roadway. The <br />thin-walled tube .samples would be used to perform laboratory consolidation testing <br />for evaluation of potential magnitude and time rate of settlement. <br />6. Groundwater levels will be measured in each of the boreholes upon thein completion, <br />and again after an approximate 24-hour period to allow the water table time to <br />stabilize, when possible. Additionally, we plan to install 6 -foot deep temporary <br />piezometers at. approximately '1,0004bot centers (excluding the- unimproved roadway <br />section between the lakes) to measure the watertable levels over a period of time to <br />help establish the range of groundwater fluctuations. <br />7. Six (6) soils samples will be collected for corrosion series testing. <br />Pond Areas <br />1. Explore the subsurface conditionsat the wet pond site with two (2), 20400t deep SPT <br />borings. Explore the subsurface conditions at the two dry pond sites with four (4), <br />1 Moot deep SPT borings. The pond SPT borings which are not utilized for <br />piezometer construction will be grout sealed after their completion. The SPT borings <br />that will be drilled for the proposed wet pond location may need to be drilled within <br />the roadway right of way, adjacent to the pond due to access issues (area was flooded <br />at the time of this proposal), <br />2. Conduct two (2) field permeability tests to assess the hydraulic conductivity of the <br />subsoils within. proposed dry pond areas. The tests will be conducted in 10 -foot deep <br />boreholes utilizing the SFWMD open hole, constant head test method. <br />3. Install two (2), 10 -foot deep temporary piezometers, one in the wet pond- and one in a <br />selected dry pond site. Obtain groundwater readings in the piezometers once per <br />week for 3 weeks. <br />4. Two (2) soil samples for Limerock Bearing Ratio (LBR) testing will be collected <br />from proposed pond areas. <br />Mast Arms <br />1. Explore the subsurface conditions at the 53,d Street intersection with U.S. Highway 1 <br />with four (4), 35 -foot deep SPT borings, one drilled at each corner. Explore the <br />subsurface conditions at each ofthe 53rd Street intersections with Old_Dixie Highway, <br />the Publix access road and Indian. River Boulevard with two (2), 35 -foot deep SPT <br />borings drilled at diagonally: opposite corners (if feasible). <br />Dunkelberger <br />