' Answer: The tum lane was constructed after the Drawings were prepared . <br /> However, there will be no construction work for this project in the area of <br /> the new tum lane . <br /> 8 . k. Question: Is there a drawing that shows the location of a dewatering pit ? <br /> Answer: No . The location of a dewatering pit will be discussed with the <br /> Contractor at the pre-construction conference . <br /> ' Items No . 9 . a through 9 . d , inclusive — The following information is provided in <br /> response to a letter from Johnson - Davis , Inc . dated April 21 , 2003 : <br /> ' 9 . a . Question : Missing data for structures 19, 10, 12, 13, 20. <br /> Answer: These structures are not in the work area and therefore , will be <br /> unaffected by construction . <br /> ' 9 . b. Question: Sheet 7, overflow Structure <br /> #41B, requires flap gate description. <br /> Answer: The flap gate valve shown on Overflow Structure #41 B on Sheet 7 <br /> ' of the Drawings shall be a Waterman Model F- 10 Automatic Drainage <br /> Gate . It shall have stainless steel links , bolts , and bushings , bronze <br /> seating faces , and shall be galvanized per ASTM standards . <br /> ' 9 . c . Question: Sheet 8 i <br /> p pe backfill detail, ►s filter cloth continuous for the full <br /> length of the pipe run or only at joint, as pictured ? <br /> ' Answer: The filter cloth is continuous for the full length of the pipe where <br /> slotted ERCP is installed . For all other pipe , the filter cloth is required at <br /> ' all pipe joints as shown in the Filter Fabric Jacket detail . <br /> 9 . d . Question: Description of Item 6. 01 & 6. 02 imported Type 2 & Type 3 <br /> ' f►ll/backfill. Plan Sheet 8 indicates select rill and approved rill. Please <br /> describe each item and where located. <br /> Answer: With the exception of " Pipe Backfill Detail @ U . S . Hwy. No . V on <br /> ' Sheet 8 , refer to Section 02220 for all fill and backfill information and <br /> requirements . The technical specifications govern over the Drawings . <br /> The pipe covered by the "Pipe Backfill Detail @ U . S . Hwy. No . 1 " on Sheet <br /> ' 8 shall be constructed according to that detail . <br /> There is no specifically identified location where Bid Items 6 . 01 and <br /> 6 . 02 are required and they may or may not be required . Those Bid Items <br /> ' are included in order to establish a contract price in case they are <br /> required . <br /> ' + + END OF ADDENDUM NO . 1 + + <br /> ' Addendum No . 1 - 4 <br /> EAST GIFFORD <br /> F:\Public WorksWeithmstormwater Projects\Gifford East\Construction Contract\Bidding & Contract Documents\Bidding & <br /> Contract DocumentsWddendum #001 .doc <br />