My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provide a minimum of 18-inches clearance between the drainage structure <br /> bottom and the top of the pipe . If possible , deflect the pipe joints to <br /> ' provide the elevation transition between the remaining existing PVC pipe <br /> and the new ductile iron pipe . New PVC water main may be used to <br /> provide the transition required to maintain appropriate joint deflections . <br /> ' Otherwise , use 45-degree bends with appropriate joint restraint, to make <br /> the elevation transition . All work shall be per Indian River County Division <br /> of Utility Services ' specifications . The pay for this work shall be included <br /> ' with the other water main relocations that are shown on the Drawings , in <br /> Pay Item No . 5 . 02 . <br /> ' 8 .e. Question: Does the Railroad require special insurance ? <br /> Answer: Yes . Refer to paragraph 2 . 1 of Section 01040 , Appendix A, <br /> Section 00620 — Sample Certificate of Liability Insurance , and the various <br /> ' insurance requirement paragraphs in the Supplementary Conditions . <br /> 8 .f. Question : Will the railroad or County provide a flagman for the railroad <br /> ' bore and jack? <br /> Answer: Per Section 01040 , paragraph 2 . 1 .A, "at least five days before <br /> ' entering onto Railway property, schedule a Florida East Coast Railway <br /> Company, L . L. C . ( FEC ) flagman/watchman by calling Mr. Charles Stone <br /> of. the FEC Engineering Department at (904 ) 826-2369 . " The flagman will <br /> be t provided by the railroad , but the railroad will charge for the flagman 's services . This cost shall <br /> be included in the Contractor' s bid for the railroad <br /> bore and jack. <br /> ' 8 . g . Question: Where is the stockpile area ? <br /> Answer: Refer to Section 01543 paragraph 1 . 8 and Section 02220 <br /> ' paragraph 3 . 15 . 8 . (The stockpile area is located at the Indian River <br /> County Road and Bridge Complex at 455 41st Street. ) <br /> 8 . h . Question: Who will pile the material to be stockpiled, the Contractor or the <br /> County? <br /> Answer: Per Section 02220 paragraph 3 . 15 . 13 , " Indian River County will <br /> ' provide all labor, machinery, and equipment necessary to spread and pile <br /> the excess material at the stockpile site . <br /> 8 . 1 . Question: If rain forces work on weekends, will the Contractor have to pay <br /> ' . overtime for the County Inspector? <br /> Answer: Yes . Refer to paragraph SC-6 . 02 . 13 of the Supplementary <br /> ' Conditions . <br /> 8 .j . Question: Is the new tum lane at the Hess Station reflected on the <br /> ' Drawings ? <br /> ' Addendum No . - <br /> 1 3 EAST GIFFORD <br /> R\Public Works\KeithM\Stormwater Projects\Gifford East\ConstrucUon Contract\Bidding & Contract Documents\Bidding & <br /> ' Contract Documents\Addendum #001 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.