' width for the height of the rock , at minimum 200-foot intervals alongthe trench . <br /> h . <br /> ' Item No. 6 — Revise paragraph SC-4 . 02 . D of the Supplementary Conditions to <br /> read : " Reports and drawings itemized in SC-4 . 02 . 0 are not included with the <br /> Bidding Documents . Copies may be examined at Indian River County Public <br /> ' Works , 1840 25th Street 4798 2. 4 Gil .84 , Vero Beach , Florida , during regular <br /> business hours . These reports are not part of the Contract Documents . " <br /> ' Item No . 7 — Clarification regarding the last date that written questions will be <br /> answered by the ENGINEER : In accordance with Article 7 — Interpretations and <br /> Addenda , written questions about the meaning or intent of the Bidding <br /> ' Documents must be received on or before April 28 , 2003 . This is different than <br /> the date given in the pre-bid conference . <br /> ' Items No. 8 . a through 8 . k, inclusive — The following information is provided in <br /> response to questions raised at the April 17 , 2003 Pre-Bid Conference : <br /> ' 8 . a . Question : The 324nch diameter casing pipe under the railroad crossing is <br /> an oddball size. Can another, more standardized casing pipe size be <br /> used? <br /> Answer: Per the Carter Associates , Inc . design engineer, a 32-inch <br /> diameter casing pipe is the minimum acceptable size . To avoid possible <br /> ' delays brought about by requesting F . E . C . Railroad approval of a larger <br /> casing size , the permitted 32-inch diameter casing pipe shall be used . <br /> ' 8 . b. Question: Does the paving detail that appears on Sheet 8 apply to <br /> driveways as well as roadways ? <br /> Answer: No . Refer to Section 02526 , paragraph 3 . 2 , "Sidewalk and <br /> ' Driveway Restoration . " <br /> 8 . c . Question : Does the pipe backrill detail on Sheet 8 apply to all pipe along <br /> ' U. S. No. 9 ? <br /> Answer: The answer given at the pre-bid conference was incorrect. Per <br /> the Carter Associates , Inc. design engineer, all pipe in U . S . No . 1 right-of- <br /> ' way does have to be installed per the " Pipe Backfill Detail @ U . S . Hwy. <br /> No . 1 " as shown on Sheet 8 . (This system will serve as an infiltration <br /> gallery to lower the groundwater table . ) <br /> ' 8 . d . Question : The plans show some structures sitting on top of existing water <br /> main. Will the water main need to be relocated ? <br /> ' Answer: Along U . S . Highway No . 1 , there are at least two drainage <br /> structures that are located over an existing 8-inch PVC water main . In <br /> these instances , remove the existing PVC water main from below the <br /> ' proposed drainage structure location and install a new 18400t or 2046ot <br /> section of ductile iron pipe water main . Place the ductile iron pipe so that <br /> the drainage structure is located over the center of the pipe ' s length . <br /> ' <br /> Addendum No. 1 - <br /> 2 EAST GIFFORD <br /> R\Public Works\KeithM\Stormwater Projects\Gftrd East\Construction Contract\Bidding & Contract Documents\Bidding & <br /> ' Contract Documents\Hddendum #001 .doc <br />