My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Agreement (subject to the provisions of paragraph 11 .03 in the Solid Waste Disposal Act (42 USC Section 6903) as <br /> the case of Unit Price Work), amended from time to time. <br /> ' 14. Contract Times—The number of days or the 25 . Laws and Regulations; Laws or Regulations— <br /> dates stated in the Agreement to: (i) achieve Substantial Any and all applicable laws, rules, regulations, ordinances, <br /> Completion; and (ii) complete the Work so that it is ready codes, and orders of any and all governmental <br /> bodies, <br /> ' for final payment as evidenced by ENGINEER' s written agencies, authorities, and courts having jurisdiction. <br /> recommendation of final payment. <br /> 26. Liens—Charges, security interests, or <br /> 15 . CONTRACTOR--The individual or entity with encumbrances upon Project funds, real property, or personal <br /> whom OWNER has entered into the Agreement. property. <br /> 16 . Cost of the Work—See paragraph I LOLA for 27. Milestone--A principal event specified in the <br /> ' definition. Contract Documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the <br /> 17. Drawings—That part of the Contract Work. <br /> ' Documents prepared or approved by ENGINEER which <br /> graphically shows the scope, extent, and character of the 28 . Notice of Award—The written notice by <br /> Work to be performed by CONTRACTOR Shop OWNER to the apparent successful bidder stating that upon <br /> Drawings and other CONTRACTOR submittals are not timely compliance by the apparent successful' <br /> bidder with Drawings as so defined. the conditions precedent listed therein, OWNER will sign <br /> 18 . Effective Date of the Agreement—The date and deliver the Agreement. <br /> ' indicated in the Agreement on which it becomes effective, 29. Notice to Proceed--A written notice given by <br /> but if no such date is indicated, it means the date on which OWNER to CONTRACTOR fixing the date on which the <br /> the Agreement is signed and delivered by the last of the two Contract Times will commence to run and on which <br /> parties to sign and deliver. CONTRACTOR shall start to perform the Work under the <br /> ' 19. ENGINEER--The individual or entity named Contract Documents. <br /> as such in the Agreement. 30. OWNER--The individual, entity, public body, <br /> ' or authority with whom CONTRACTOR has entered into <br /> 20. ENGINEER 's Consultant—An individual or the Agreement and for whom the Work is to be performed. <br /> entity having a contract with ENGINEER to furnish <br /> services as ENGINEER's independent professional 31 . Partial Utilization—Use by OWNER of a <br /> associate or consultant with respect to the Project and who substantially completed part of the Work for the purpose for <br /> is identified as such in the Supplementary Conditions. which it is intended (or a related purpose) <br />prior to <br /> 21 . Field Order—A written order issued by Substantial Completion of all the Work. <br /> ENGINEER which requires minor changes in the Work but 32. PCBs—Polychlorinated biphenyls. <br /> which does not involve a change in the Contract Price or the <br /> Contract Times. 33 . Petroleum--Petroleum, including crude oil or <br /> any fraction thereof which is liquid at standard conditions of <br /> 22 . General Requirements—Sections of Division temperature and pressure (60 degrees Fahrenheit and 14. 7 <br /> 1 of the Specifications. The General Requirements pertain pounds per square inch absolute), such as oil, petroleum, <br /> ' to all sections of the Specifications. fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil <br /> mixed with other non-Hazardous Waste and crude oils. <br /> 23 . Hazardous Environmental Condition—The <br /> presence at the Site of Asbestos, PCBs, Petroleum, 34. Project—The total construction of which the <br /> ' Hazardous Waste, or Radioactive Material in such Work to be performed under the Contract Documents may <br /> quantities or circumstances that may present a substantial be the whole, or a part as may be indicated elsewhere in the <br /> danger to persons or property exposed thereto in connection Contract Documents. <br /> with the Work <br /> 35 . Project Manual--The bound documentary <br /> 24 . Hazardous Waste--The term Hazardous information prepared for bidding and constructing the <br /> ' Waste shall have the meaning provided in Section 1004 of Work A listing of the contents of the Project Manual, <br /> 00700 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.