Laserfiche WebLink
' which may be bound in one or more volumes, is contained 45 . Supplier--A manufacturer, fabricator, suppli- <br /> in the table(s) of contents. er, distributor, materialman, or vendor having a direct <br /> ' contract with CONTRACTOR or with any Subcontractor to <br /> 36. Radioactive Material—Source, special nucle- furnish materials or equipment to be incorporated in the <br /> ar, or byproduct material as defined by the Atomic Energy Work by CONTRACTOR or any Subcontractor. <br /> Act of 1954 (42 USC Section 2011 et seq.) as amended <br /> ' from time to time. 46. Underground Facilities--All underground <br /> pipelines, conduits, ducts, cables, wires, manholes, vaults, <br /> 37. Resident Project Representative—The autho- tanks, tunnels, or other such facilities or attachments, and <br /> ' rized representative of ENGINEER who may be assigned to any encasements containing such facilities, including those <br /> the Site or any part thereof. that convey electricity, gases, steam, liquid petroleum <br /> products, telephone or other communications, cable <br /> 38 . Samples—Physical examples of materials, television, water, wastewater, storm water, other liquids or <br /> ' equipment, or workmanship that are representative of some chemicals, or traffic or other control systems. <br /> portion of the Work and which establish the standards by <br /> which such portion of the Work will be judged. 47. Unit Price Work--Work to be paid for on the <br /> ' 39. Shop Drawings—All drawings, diagrams, basis of unit prices. <br /> illustrations, schedules, and other data or information which 48 . Work—The entire completed construction or <br /> are specifically prepared or assembled by or for CON- the various separately identifiable parts thereof required <br />to <br /> ' TRACTOR and submitted by CONTRACTOR to illustrate be provided under the Contract Documents. Work includes <br /> some portion of the Work. and is the result of performing or providing all labor, <br /> services, and documentation necessary to produce such <br /> 40. Site—Lands or areas indicated in the Contract construction, and furnishing, installing, and incorporating <br /> Documents as being finnished by OWNER upon which the all materials and equipment into such construction, all as <br /> Work is to be performed, including rights-of-way and required by the Contract Documents. <br /> easements for access thereto, and such other lands furnished <br /> ' by OWNER which are designated for the use of 49 . Work Change Directive—A written statement <br /> CONTRACTOR. to CONTRACTOR issued on or after the Effective Date of <br /> the Agreement and signed by OWNER and recommended <br /> ' 41 . Specifications—That part of the Contract by ENGINEER ordering an addition, deletion, or revision <br /> Documents consisting of written technical descriptions of in the Work, or responding to differing or <br /> unforeseen <br /> materials, equipment, systems, standards, and workmanship subsurface or physical conditions under which the Work is <br /> as applied to the Work and certain administrative details to be performed or to emergencies. A Work <br /> Change <br /> applicable thereto. Directive will not change the Contract Price or the Contract <br /> Times but is evidence that the parties expect that the change <br /> 42 . Subcontractor--An individual or entity having ordered or documented by a Work Change Directive will be <br /> ' a direct contract with CONTRACTOR or with any other incorporated in a subsequently issued Change Order <br /> Subcontractor for the performance of a part of the Work at following negotiations by the parties as to its effect, if any, <br /> the Site, on the Contract Price or Contract Times. <br /> ' 43 . Substantial Completion—The time at which 50. Written Amendment—A written statement <br /> the Work (or a specified part thereof) has progressed to the modifying the Contract Documents, signed by OWNER and <br /> point where, in the opinion of ENGINEER, the Work (or a CONTRACTOR on or after the Effective Date of the <br /> ' specified part thereof) is sufficiently complete, in Agreement and normally dealing with the nonengineering or <br /> accordance with the Contract Documents, so that the Work nontechnical rather than strictly construction-related aspects <br /> (or a specified part thereof) can be utilized for the purposes of the Contract Documents. <br /> ' for which it is intended. The terms "substantially complete" <br /> and "substantially completed" as applied to all or part of the 1 . 02 Terminology <br /> Work refer to Substantial Completion thereof. <br /> ' 44. Supplementary Conditions—That part of the A. Intent of Certain Terms or Adjectives <br /> Contract Documents which amends or supplements these 1 . Whenever in the Contract Documents the <br /> General Conditions. terms "as allowed," "as approved," or terms of like <br /> ' effect or import are used, or the adjectives "reasonable," <br /> ' 00700 - 8 <br />