My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' mentation as required by the Contract Documents, <br /> ENGINEER is satisfied that the Work has been A. The making and aeeeptanee of final payment <br /> ' completed and CONTRACTOR' s other obligations <br /> under the Contract Documents have been fulfilled, <br /> ENGINEER will, within ten days after receipt of the <br /> final Application for Payment, indicate in writing <br /> ' ENGINEER's recommendation of payment and from unsoded Liens, fiem aec et W k <br /> appear- <br /> present the Application for Payment to OWNER for <br /> payment. At the same time ENGINEER will also 14 ,061 fie s flux-e toly • th the GentFaet <br /> give written notice to OWNER and CON- Doeu r eats t e ^' of a ny <br /> e TRACTOR that the Work is acceptable subject to spee�tPd therein—er frem GON RACTORIs <br /> the provisions of paragraph 14.09. Otherwise, <br /> ENGINEER will return the Application for Payment meats;aad <br /> ' to CONTRACTOR, indicating in writing the reasons <br /> for refusing to recommend final payment, in which 2 a waiver of aH Clafins by rG�R4; n r <br /> case CONTRACTOR shall make the necessary TOR against OWNER other- then "se pr-evieusly <br /> corrections and resubmit the Application for fmde in mTifi" vAiieh are still unsettled-. <br /> Payment. <br /> Paragraph 14.07.C.1 has been deleted and replaced with ARTICLE 15 - SUSPENSION OF WORK AND <br /> a new paragraph. See the Supplementary Conditions. TERMINATION <br /> C. Payment Becomes Due <br /> 1 • Thirty days after the—Fesentatien—te 15 .01 OWNER May Suspend Work <br /> 93AEAMR e€ the—Appheation--fer- Payment and <br /> The last sentence of Paragraph 15.01 .A has been deleted <br /> and replaced with new sentences. See the <br /> when due, will be paid by OWNER e CON Supplementary Conditions. <br /> TRAGTOR- A. At any time and without cause, OWNER may <br /> suspend the Work or any portion thereof for a period of not <br /> 14 . 08 Final Completion Delayed more than 90 consecutive days by notice in writing to CON- <br /> TRACTOR and ENGINEER which will fix the date on <br /> A. If, through no fault of CONTRACTOR, final which Work will be resumed. CONTRACTOR shall <br /> completion of the Work is significantly delayed, and if resume the Work on the date so fixed. GOOD <br /> ENGINEER so confirms, OWNER shall, upon receipt of shall be allewed an adjustment in the GeatFaet Pr-iee or--" <br /> CONTRACTOR' s final Application for Payment and eiReasion —e€ the Een&aet Times, or- beth;—dir-eetl3 <br /> recommendation of ENGINEER, and without terminating attributable e t any e if GG * : GTnn <br /> suspension <br /> the Agreement, make payment of the balance due for that <br /> portion of the Work fully completed and accepted. If the <br /> remaining balance to be held by OWNER for Work not 15 .02 OWNER May Terminate for Cause <br /> fully completed or corrected is less than the retainage <br /> stipulated in the Agreement, and if Bonds have been A. The occurrence of any one or more <br /> of the <br /> furnished as required in paragraph 5 .0 1 , the written consent following events will justify termination for cause: <br /> of the surety to the payment of the balance due for that <br /> ' portion of the Work fully completed and accepted shall be 1 . CONTRACTOR's persistent failure to <br /> submitted by CONTRACTOR to ENGINEER with the perform the Work in accordance with the Contract <br /> Application for such payment. Such payment shall be made Documents (including, but not limited to, failure to <br /> under the terms and conditions governing final payment, supply sufficient skilled workers or suitable materi- <br /> except that it shall not constitute a waiver of Claims. als or equipment or failure to adhere to the progress <br /> schedule established under paragraph 2 .07 as <br /> 14 . 09 Waiver of Claims adjusted from time to time pursuant to paragraph <br /> ' Paragraph 14.09 has been deleted and replaced in its 6.04); <br /> entirety with a new paragraph. See the Supplementary 2. CONTRACTOR's disregard of Laws or <br /> Conditions. Regulations of any public body having jurisdiction; <br /> 00700 - 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.