3 . CONTRACTOR' S disregard of the 15 .03 OWNER May Terminate For Convenience
<br /> ' authority of ENGINEER; or A. Upon seven days written notice to CON-
<br /> TRACTOR and ENGINEER, OWNER may, without cause
<br /> 4. CONTRACTOR' s violation in any and without prejudice to any other right or remedy of
<br /> substantial way of any provisions of the Contract OWNER, elect to terminate the Contract. In such case,
<br /> ' Documents. CONTRACTOR shall be paid (without duplication of any
<br /> items) :
<br /> New Paragraphs 15.02.A.5 and 15.02.A.6 have been
<br /> added. See the Supplementary Conditions. 1 . for completed and acceptable Work
<br /> executed in accordance with the Contract Docu-
<br /> The third sentence of Paragraph 15.02.B has been ments prior to the effective date of
<br /> termination,
<br /> deleted and replaced with a new sentence. See the including fair and reasonable sums for overhead and
<br /> ' Supplementary Conditions. profit on such Work;
<br /> B . If one or more of the events identified in paragraph
<br /> 15 . 02 .A occur, OWNER may, after iing CONTRACTOR 2 , for expenses sustained prior to the
<br /> (and the surety, if any) seven days written notice, terminate effective date of termination in performing services
<br /> the services of CONTRACTOR, exclude CONTRACTOR and furnishing labor, materials, or equipment as re-
<br /> from the Site, and take possession of the Work and of all quired by the Contract Documents in connection
<br /> CONTRACTOR' s tools, appliances, construction equip- with uncompleted Work, plus fair and reasonable
<br /> ment, and machinery at the Site, and use the same to the full sums for overhead and profit on such expenses ;
<br /> extent they could be used by CONTRACTOR (without
<br /> liability to CONTRACTOR for trespass or conversion), Paragraph 15.03.A3 has been deleted in its entirety.
<br /> incorporate in the Work all materials and equipment stored 3 . feFall elaktns, eests, losses, and damages
<br /> at the Site or for which OWNER has paid CONTRACTOR (including 1.. .t net to all fees " a 1. bF
<br /> but which are stored elsewhere, and finish the Work as a gi eers2 arm
<br /> ehiteets, atteeys, and eth
<br /> OWNER may deem expedient. In such case,
<br /> CONTRACTOR shall not be entitled to receive any further dispute ..e"..1..F: ..« ewes) : a in tdement r
<br /> payment until the Work is finished.
<br /> the GentFaet Pr-iee e3weeds n 1 1 � �;Sad
<br /> � e s
<br /> ' damage" `.«,hiding but not hmited to " 11 fees and ehar_es of
<br /> ffehiteets> 4, for reasonable expenses directly
<br /> attributable to termination.
<br /> ^Vlerag the Werk; sash emeess will be paid —te B . CONTRACTOR shall not be paid on account of
<br /> CONTRACTOR; If such claims, costs, losses, and loss of anticipated profits or revenue or other economic loss
<br /> damages exceed such unpaid balance, CONTRACTOR arising out of or resulting from such termination.
<br /> ' shall pay the difference to OWNER. Such claims, costs,
<br /> losses, and damages incurred by OWNER will be reviewed 15 .04 CONTRACTOR May Stop Work or Terminate
<br /> by ENGINEER as to their reasonableness and, when so
<br /> ' approved by ENGINEER, incorporated in a Change Order. Parts of Paragraph 15.04 have been deleted.
<br /> When exercising any rights or remedies under this A. If, through no act or fault of CONTRACTOR, the
<br /> paragraph OWNER shall not be required to obtain the Work is suspended for more than 90 consecutive days
<br /> by
<br /> lowest price for the Work performed. OWNER or under an order of court or other public
<br /> authority, or ENGINEER fails to act on any Application for
<br /> C. Where CONTRACTOR's services have been so Payment within 30 days after it is submitted, e- ^��
<br /> terminated by OWNER, the termination will not affect any fait " f- 30 days t pay GG@h -n A GFQ « 4::«„
<br />11. .
<br /> '
<br /> rights or remedies of OWNER against CONTRACTOR deter.«:«ed to be due
<br /> g g , then CONTRACTOR may, upon
<br /> then existing or which may thereafter accrue. Any retention seven days written notice to OWNER and ENGINEER, and
<br /> or payment of moneys due CONTRACTOR by OWNER provided OWNER or ENGINEER do not remedy such
<br /> will not release CONTRACTOR from liability. suspension or failure within that time, terminate the
<br /> Contract and recover from OWNER payment on the same
<br /> A new Paragraph 15.02 .D has been added. See the terms as provided in paragraph 15 .03 . In lieu of terminating
<br /> Supplementary Conditions. the Contract and without prejudice to any other right or
<br /> remedy, if ENGINEER has failed to act on an Application
<br /> 00700 - 44