My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> C . Item 1 . 03 - Project Record Documents : <br /> 1 1 . Measurement and Payment: The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> prepare Project Record Documents , including survey work and AutoCad work . <br /> 1 This bid item shall be paid in the final pay request and after the Record <br /> Documents have been approved by the ENGINEER . No partial payments for <br /> Project Record Documents shall be made . No additional payment will be made <br /> 1 for revisions to Project Record Documents to make them comply with the <br /> contract requirements . <br /> 1 D . Item 1 . 04 - Performance Bond : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for providing a Performance Bond as required by these Contract Documents , <br /> 1 The total lump sum to be paid for this item shall not exceed one and one - <br /> half ( 1 . 5) percent of the total bid. Twenty-five (25 ) percent of the bid item <br /> amount may be paid in the first application for payment and the remaining <br /> 1 seventy-five (75 ) percent of the bid item amount shall be paid in the last <br /> application for payment. <br /> 1 E . Item 1 . 05 an Payment Bond : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for providing a Payment Bond as required by these Contract Documents . The <br /> 1 total lump sum to be paid for this item shall not exceed one and one -half <br /> (1 . 5) percent of the total bid . Twenty-five (25) percent of the bid item amount <br /> may be paid in the first application for payment and the remaining seventy-five <br /> 1 (75 ) percent of the bid item amount shall be paid in the last application for <br /> payment. <br /> 1 F . Item 1 . 06 - Survey Work: <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> 1 establish and protect survey control points , replace disturbed or destroyed <br /> property monuments and survey control points , and perform construction <br /> staking . Twenty-five (25 ) percent of the bid item amount may be paid in the first <br /> ' application for payment, twenty-five (25) percent may be paid at approximately <br /> the one-half way point in the construction contract, and the remaining fifty (50 ) <br /> ' percent of the bid item amount shall be paid in the last application for payment . <br /> G . Item 1 . 07 — Project Photographs : <br /> ' 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for photographic construction documentation as specified . Twenty-five (25 ) <br /> percent of the bid item amount may be paid in the first application for payment <br /> 1 and the remaining seventy-five (75 ) percent of the bid item amount shall be <br /> Last revised 4/29/03 01025-3 EAST GIFFORD <br /> ' FAPublic Works\KeithM\Stormweter Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.