Laserfiche WebLink
1 <br /> 1 <br /> paid in the last application for payment. <br /> ' H . Item 1 . 08 = Insurance Coverage (Bid Items 1 . 08A through F , inclusive ) : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for providing the insurance coverage required by the Contract Documents . <br /> Payment for Insurance Coverage will not be made until the project is complete <br /> and accepted by the OWNER. <br /> ' EARTHWORK <br /> ' I . Item 2 . 01 — Prevention , Control , and Abatement of Erosion and Water Pollution <br /> From the Construction Site and the Contractor's Activities : <br /> 1 . 1 Item 2 . 01A — Design : <br /> ' 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for site-specific design of an erosion and stormwater pollution control system (s) <br /> by a specialty subcontractor in accordance with the Contract Documents and <br /> ' regulatory requirements , including but not limited to , all labor; materials ; and <br /> equipment . <br /> 1 . 2 Item 2 . 01 B — Installation : <br /> ' 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for a specialty subcontractor installing an erosion and stormwater pollution <br /> control system (s ) in accordance with the Contract Documents and regulatory <br /> ' requirements , including but not limited to , all labor; materials ; and equipment. <br /> Upon proper installation , the CONTRACTOR may be paid for up to 75 percent <br /> of the bid item amount, with the remainder being paid when the Work is <br /> ' complete and accepted by the OWNER . <br /> 1 . 3 Item 2 . 01 C — Maintenance : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for a specialty subcontractor maintaining the erosion and stormwater pollution <br /> control system (s ) in accordance with the Contract Documents and regulatory <br /> requirements , including but not limited to , all labor; additional materials ; <br /> ' replacement materials ; and equipment. The CONTRACTOR may invoice for 50 <br /> percent of this bid item when the Work is approximately one-half complete . <br /> The remainder will be paid when the Work is complete and accepted by the <br /> ' OWNER. <br /> J . Item 2 . 02 - Demolitions : <br /> ' 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for providing all labor, materials , equipment, and transportation required for <br /> demolition activities , including but not limited to protection of surrounding <br /> ' property, demolition , disposal of demolished materials (including but not limited <br /> to existing structures , trash , debris , equipment, etc. ) , and cleaning . <br /> Last revised <br /> 4/29/03 010254 EAST GIFFORD <br /> ' F:\Public Works\Keithmstormveter Projects\Gifford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> 1 \01 025 - Measurement and PaKnent - Revised April 29, 2003.doc <br />