Laserfiche WebLink
1 <br /> 1 <br /> material . <br /> ' Q . Item 2 . 09 — Stockpile Excess Topsoil and Excavated Material Per Specifications : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for hauling and stockpiling excess topsoil and excess excavated material . The <br /> lump sum payment includes , but is not limited to furnishing all labor, materials , <br /> tools , equipment , and transportation . Note : Indian River County will provide <br /> ' labor, equipment, and machinery necessary to spread and stockpile the <br /> material at the stockpile site , <br /> ' STRUCTURES <br /> R . Items 3 . 01 , 3 . 021 3 . 031 3 . 041 3 . 05 , and 3 . 06 — [Miscellaneous Structures] : <br /> 1 . Measurement: The quantity of structures in -place will be the number furnished <br /> and installed as - shown and specified on the Drawings . <br /> 2 . Payment: The unit price for each structure will be full compensation for <br /> furnishing all labor, materials and equipment for installation , including but not <br /> limited to , furnishing and installing structure , inlet frame and grate/cover, <br /> dewatering , excavation , bedding stone , temporary sheeting , pipe connections , <br /> ' backfill , compaction , and final grading to provide a complete installation . <br /> PIPES <br /> S . Items 4 . 019 4 . 02 , 4 . 03 , 4 . 04 , 4 . 05 , 4 . 06 4 . 07 4 . <br /> 08 , 4 . 09 , 4 . 10 , 4 . 11 , 4 . 12 , and 4 . 19 <br /> — [Miscellaneous Drainage Pipe] : <br /> ' 1 . Measurement: The quantity of drainage pipe in-place will be the number of <br /> linear feet of each size and type furnished and installed as shown on the <br /> Drawings . The lengths of pipe will be measured horizontally along the <br /> ' centerline of the completed pipe . <br /> 2 . Payment: The unit price per linear foot will be full compensation for all labor, <br /> materials , tools and equipment, including but not limited to clearing and <br /> grubbing ; trench excavation ; concrete jackets/sleeves and filter fabric; <br /> furnishing , installing , cleaning , and testing of pipe ; drainage and dewatering ; <br /> site restoration ; temporary sheeting , shoring and bracing ; restoration of <br /> ' unpaved areas ; pipe bedding ; backfill and compaction ; grading ; and protection <br /> of existing utilities and structures . <br /> ' T. Item 4 . 13 — Railroad Crossing — Jack and Bore with Steel Carrier Pipe & Steel <br /> Casing Pipe , complete : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for the bore and jack with steel carrier pipe and steel casing pipe in -place , <br /> furnished and installed as shown on the Drawings . The lump sum payment will <br /> be full compensation for furnishing all labor, materials , tools and equipment , <br /> ' Last revised 4/29/03 01025-6 EAST GIFFORD <br /> ' RIPublic Works\KeithM\Stormmter Projects\Efford East\Construction Contract\Technical Specifications\Final Specifications0vision <br /> 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc <br />