Laserfiche WebLink
1 <br /> 1 <br /> including but not limited to installation , casing pipe ; boring ; jacking ; casing <br /> ' spacers ; carrier pipe ; jointing ; cleaning ; drainage and dewatering ; specials ; site <br /> restoration ; temporary sheeting ; shoring and bracing ; excavation ; backfill and <br /> compaction ; protection of exiting utilities and structures ; and conformance to the <br /> ' requirements of the Florida East Coast Railway Company, L . L . C . <br /> U . Items 4 . 14 , 4 . 15 , 4 . 16 , and 4 . 17 — [Miscellaneous 2 : 1 Mitered End Sections , <br /> ' including connector Pipe] : <br /> 1 . Measurement: The quantity of mitered ends in-place , will be the number of each <br /> size furnished and installed as shown on the Drawings . <br /> ' 2 . Payment: The unit price per mitered end will be full compensation for all labor, <br /> materials , tools and equipment, including but not limited to , clearing and <br /> grubbing ; trench excavation ; furnishing , installing , cleaning ; drainage and <br /> dewatering ; site restoration ; temporary sheeting , shoring and bracing ; <br /> restoration of unpaved areas ; pipe bedding ; backfill and compaction ; grading , <br /> and protection of existing utilities and structures . <br /> ' V. Item 4 . 18 - Trench Safety System : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> ' for installing and maintaining a trench safety system , including but not limited to , <br /> all labor; materials ; and equipment. <br /> ' MISCELLANEOUS <br /> W . Item 5 . 01 - Remove and Replace 5' Wide Sidewalk: <br /> ' 1 . Measurement: The quantity of sidewalk removed and replaced will be the <br /> number of linear feet removed and replaced as shown on the Drawings . <br /> 2 . Payment: The unit price will be full compensation for all labor, materials , tools <br /> ' and equipment , including but not limited to , clearing and grubbing , compaction , <br /> forming , concrete , reinforcement , stripping forms , final grading , and site <br /> restoration . <br /> X. Item 5 .02 — Adjust Existing Water Mains : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> ' for all labor, materials , tools and equipment, including but not limited to clearing <br /> and grubbing ; trench excavation ; fittings and appurtenances , specials , backfill <br /> and compaction , grading , testing , and all other work required by Indian River <br /> ' County Division of Utility Services and in accordance with Indian River County <br /> Division of Utility Services standards and specifications . <br /> Y. Item 5 . 03 — Core Existing Catch Basin : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for coring the existing catch basin and connecting the pipe to the structure , <br /> Last revised 4/29/03 01025-7 EAST GIFFORD <br /> ' FAPublic Works\KeithM\Storm%Aeter Projects\Gifford East\Construction Contract\Technical Specifications\Rnal Specifications\Division <br /> 1 \01 025 - Measurement and Paynent - Revised April 29, 2003.doc <br />