Laserfiche WebLink
-1 <br /> including but not limited to all labor, materials , equipment, connection , <br /> ' excavation , dewatering , grout , fittings and appurtenances , backfill , compaction <br /> and final grading . <br /> ' Z. Item 5 . 04 — Clean Yellow Sand Berm : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for constructing the clean yellow sand berm as shown on the Drawings , <br /> ' including but not limited to all labor, materials , equipment, transportation , yellow <br /> sand , transportation , sieve analysis , placing , compaction and final grading . <br /> AA . Item 5 . 05 — 8 ' High Chain Link Fence and 16 ' wide Double Swing Gate , with 3- <br /> ' strand Barb Wire : <br /> 1 . Measurement: The quantity of chain link fence and swing gate in -place , will be <br /> the number of linear feet of fence furnished and installed as shown on the <br /> Drawings . <br /> 2 . Payment: The unit price per linear foot will be full compensation for all labor, <br /> ' materials , tools and equipment required for a complete installation , including but <br /> not limited to clearing and grubbing , grading , polyolefin elastomer coating , chain <br /> link fence fabric, tension wire , barbed wire , barbed wire attachments , line posts , <br /> ' corner posts , end posts , braces , truss rods , tie wires , swing gate , <br /> appurtenances , fittings , hardware , concrete , furnishing , installing , and site <br /> restoration . <br /> BB . Item 5 . 06 — Asphalt Pavement Repair at Road Crossings : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for restoring the roads in accordance with the Construction Drawings and <br /> Specifications , and as directed bythe ENGINEER . The lump sum paymentwill <br /> be full compensation for furnishing all labor, materials and equipment including , <br /> ' but not limited to , saw cutting ; pavement removal and disposal , including <br /> transportation and disposal fees ; compaction ; permits ; limerock base ; <br /> temporary asphalt seal coat surface ; pavement markings ; repair or replacement <br /> of damaged traffic signal devices and loops ; prime coat; tack coat; and Type & <br /> 1 asphaltic concrete for a complete patch . <br /> ' CC . Item 5 . 07 - Remove Existing 29 "x45" Mitered End : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for all labor, materials , tools and equipment, including but not limited to removal <br /> and disposal of existing mitered end ; clearing and grubbing ; excavation ; <br /> drainage and dewatering ; restoration ; backfill and compaction ; protection of <br /> existing utilities and structures ; and coordination for the relocation of existing <br /> ' facilities by the OWNER or utility. <br /> CCI Item . 5 . 08 — Miscellaneous Stormwater Measuring and Recording Equipment : <br /> Last revised 4/29/03 01025-8 EAST GIFFORD <br /> ' F:\Public Works\KeithM\Stormmter Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc <br />