Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
1 the operations . <br /> E . The OWNER reserves the right to cancel scheduled shutdowns if conditions <br /> warrant. Delays to the CONTRACTOR caused by cancellations will be <br /> considered in evaluating requests for time extension . <br /> IF . All operations of existingvalves shall <br /> be done by the Utility Company that owns <br /> the valves . There is no guarantee that valves will be 100 percent watertight . <br /> ' G . All facilities shall be tested and in operating p ating condition before final tie- ins are <br /> made . <br /> ' 1 . 3 SUBMITTALS <br /> A . Submit a detailed schedule of proposed connections , testing , etc . <br /> 1 . 4 WORK SEQUENCE <br /> A . The sequence q e of construction is the CONTRACTOR' s responsibility. <br /> + + END OF SECTION + + <br /> r <br /> Last revised 7/16/01 01014-2 EAST GIFFORD <br /> RIPublic Works\KeithM\storm"ater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01014 - Maintenance ofOperations.doc <br />