two opposite sides of the structure , beginning at the bottom of the <br /> excavation and ending at finish grade . <br /> D . If any tests are unsatisfactory , the CONTRACTOR shall re-excavate and/or <br /> recompact the material at his expense , until the required density is <br /> ' obtained . <br /> 3 . 11 GENERAL REQUIREMENTS FOR THE PLACEMENT AND COMPACTION OF <br /> ' BACKFILL AND FILL <br /> A . Furnish , place and compact all backfill and fill material required for <br /> ' structures and trenches and to provide the finished grades shown and <br /> specified . Unless otherwise specified , material may be obtained from <br /> on -site sources . Additional materials , if required , shall be furnished from <br /> ' off-site sources in accordance with paragraphs 2 . 1 . C . and 2 . 1 . E . <br /> B . In general , spread and dump fill in horizontal loose layers not exceeding 12 . <br /> ' inches loose thickness . Within 5 feet of structures , the fill/backfill shall not <br /> exceed 6- inches loose thickness . Mix and spread the fill in a manner <br /> assuring uniform lift thickness after placing . Backfill around buried walls <br /> 1 should be placed in level lifts not exceeding 6 - inches loose thickness . <br /> During the process of dumping and spreading , remove all roots , debris , and <br /> stones greater than 1 - 1 /2 inches diameter from the fill areas . Assign a <br /> ' sufficient number of men to this work to insure satisfactory compliance with <br /> these requirements . <br /> C . If the compacted surface of any layer of material is determined to be too <br /> smooth to bond properly with the succeeding layer, loosen the surface <br /> before the succeeding layer is placed . <br /> ' D . All backfill and fill materials shall belaced and compacted " in -the-dry" . <br /> P P rY <br /> Dewater excavated areas as required to perform the work and in such <br /> manner as to preserve the undisturbed state of the natural inorganic soils . <br /> ' E . Place backfill and fill materials evenly adjacent to structures , to required <br /> elevations . Take care to prevent wedging action of backfill against <br /> structures by carrying the material uniformly around the structure to <br /> approximately the same elevation in each lift. <br /> F . Prior to the installation of pipes which are to be installed in fill or <br /> ' embankment sections , place the fill until a minimum height of 24eet above <br /> the pipe is reached , unless otherwise specified . The pipe trench shall then <br /> Last revised 9/ 10/02 02220- 14 EAST GIFFORD <br /> RIPublic Works\Keithmstorm ater Projects\Efford East\construction contract\Technical Specifications\Final Specifications\Division <br /> ' 2\02220 - Excavation and Backill .doc <br />