My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' exercises the option to use Class B Bedding at no extra cost to the <br /> OWNER . <br /> ' C . Unsuitable Bedding Material : If the materials encountered at the normal <br /> bottom of the trench excavation are in the sole judgment of the ENGINEER , <br /> ' unsuitable to act as foundation for the pipe , such material shall be <br /> excavated to the depth necessary to obtain a suitable foundation . ( Refer to <br /> paragraph 3 . 4 , " Removal of Muck , Rock and Other Unstable Material . " ) <br /> Remove the unsuitable material and replace it with "Type 3 " material as <br /> defined in paragraph 2 . 1 . C . <br /> ' D . Pipe Trench Backfill : <br /> 1 . Place all backfilling in pipe trenches that are below structures , other <br /> pipes or paved areas , in horizontal layers not exceeding 6 -inches in <br /> ' depth and thoroughly compact each before the next layer is placed . In <br /> other pipe trenches , compacted layers shall be 6- inches thick up to the <br /> pipe centerline and up to 12 - inches thick thereafter. <br /> 2 . Backfill shall be deposited evenly along both sides of the pipe from a <br /> maximum height of 2 feet above the top of the pipe . Material shall not <br /> be dropped directly on the unprotected pipe surface . <br /> ' 3 . Where thrust blocks , encasement , or other cast-in - place concrete <br /> items are used , no backfilling shall be placed until the specific items <br /> have been observed and accepted by the ENGINEER . <br /> ' 4 . Backfill Material : <br /> a . In most circumstances , excavated material from the pipe trench <br /> should be acceptable as backfill . This backfill material must meet <br /> ' the requirements of "Type 2 " material as defined in paragraph <br /> 2 . 1 . 13 . Otherwise , use "Type 3 " material as defined in paragraph <br /> ' 2 . 1 . C . <br /> b . The backfill from the trench bottom to 124ches above the top of <br /> the pipe shall not contain rock or stone fragments greater than 1 - <br /> ' 1 /2 inches diameter. The maximum diameter of a rock or stone <br /> fragment in the rest of the backfill shall not exceed 6- inches . <br /> E . Compaction Methods : <br /> ' 1 . All backfill to the springline ( centerline ) of the pipe shall be thoroughly <br /> compacted with curved end tamping bars under and on each side of <br /> ' the pipe and flat tamped between the pipe and the trench wall . This <br /> compaction shall be completed before the remainder of the trench is <br /> backfilled . Take extra care to adequately compact the haunch area of <br /> the pipe without lifting the pipe off the bedding . The remainder of the <br /> ' backfill may be compacted by power-operated tampers , rollers , or <br /> vibratory equipment . <br /> Last revised 9/ 10/02 02220- 18 EAST GIFFORD <br /> FAPublic Works\KeithM\stop-nmter Projects\Gfford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 2\02220 - Excavation and Backill .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.