' paid in the last application forPaY ment . <br /> ' H . Item 1 . 08 - Insurance Coverage (Bid Items 1 . 08A through F , inclusive ) : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for providing the insurance coverage required by the Contract Documents . <br /> Payment for Insurance Coverage will not be made until the project is complete <br /> and accepted by the OWNER . <br /> EARTHWORK <br /> I . Item 2 . 01 — Prevention , Control , and Abatement of Erosion and Water Pollution <br /> ' From the Construction Site and the Contractor' s Activities : <br /> 1 . 1 Item 2 . 01A — Design : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for site-specific design of an erosion and stormwater pollution control system (s ) <br /> by a specialty subcontractor in accordance with the Contract Documents and <br /> regulatory requirements , including but not limited to , all labor; materials ; and <br /> equipment . <br /> 1 . 2 Item 2 . 01 B — Installation : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for a specialty subcontractor installing an erosion and stormwater pollution <br /> control system (s ) in accordance with the Contract Documents and regulatory <br /> requirements , including but not limited to , all labor; materials ; and equipment . <br /> Upon proper installation , the CONTRACTOR may be paid for up to 75 percent <br /> of the bid item amount , with the remainder being paid when the Work is <br /> complete and accepted by the OWNER . <br /> 1 . 3 Item 2 . 01 C — Maintenance : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for a specialty subcontractor maintaining the erosion and stormwater pollution <br /> control system (s ) in accordance with the Contract Documents and regulatory <br /> requirements , including but not limited to , all labor; additional materials ; <br /> replacement materials ; and equipment. The CONTRACTOR may invoice for 50 <br /> percent of this bid item when the Work is approximately one- half complete . <br /> The remainder will be paid when the Work is complete and accepted by the <br /> ' OWNER . <br /> J . Item 2 . 02 - Demolitions : <br /> ' 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for providing all labor, materials , equipment, and transportation required for <br /> demolition activities , including but not limited to protection of surrounding <br /> property, demolition , disposal of demolished materials (including but not limited <br /> to existing structures , trash , debris , equipment , etc . ) , and cleaning . <br /> ' Last revised 3/31 /03 01025-4 <br /> EAST GIFFORD <br /> RIPublic Works\KeithM\Stormv,eter ProjectsIGfford East\construction contracnechnical Specifications\Fnal Specifications\Division <br /> ' 1 \01025 - Measurement and PaKnent.doc <br />