My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' K . Item 2 . 03 - Clearing and Grubbing , <br /> 9 <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for clearing and grubbing , including but not limited to , all labor, materials and <br /> equipment , obtain required permits , permit fees , removal of existing pipe , and <br /> disposal of debris . <br /> ' L . Item 2 . 04 - Grading Swales : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for grading swales , including but not limited to , all labor, grading , compaction , <br /> testing , materials , and equipment . <br /> ' M . Item 2 . 05 - Driveway Reconstruction : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for driveway reconstruction , including but not limited to all labor, equipment , grading , <br /> compaction , testing , removing and replacing existing driveway culverts with new <br /> culverts meeting Indian River County standards , and removing and replacing <br /> existing driveway materials . <br /> N . Item 2 . 06 - Sodding - Bahia : <br /> 1 . Measurement: The quantity of sod in - place will be the actual number of square <br /> i yards furnished and installed . <br /> 2 . Payment : The unit price for each square yard of sod will be full compensation <br /> for furnishing all labor, materials , and equipment for installation , including but <br /> not limited to , grading , sod , fertilizer, maintenance , mowing , and watering . <br /> Note : Payment for sodding will only be made within the limits shown on the <br /> Drawings or specified . All other sodding required due to the CONTRACTOR <br /> working outside the Limits of Construction shall be at no cost to the OWNER . <br /> O . Item 2 . 07 — Hydro-Seeding : <br /> 1 . Measurement: The quantity of hydro-seeding will be the actual number of <br /> square yards hydro-seeded . <br /> 2 . Payment: The unit price for each square yard of hydro-seeding will be full <br /> compensation for furnishing all labor, materials , and equipment for installation , <br /> including but not limited to , grading , seed , mulch , fertilizer, maintenance , and <br /> watering . Note : Payment for hydro-seeding will only be made within the limits <br /> shown on the Drawings or specified . All other hydro-seeding required due to <br /> the CONTRACTOR working outside the Limits of Construction shall be at no <br /> ' cost to the OWNER . <br /> P . Item 2 . 08 — Stormwater Pond Excavation : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for excavating and constructing the stormwater pond , including but not limited <br /> to , all labor, materials , and equipment , and hauling and disposing unsuitable <br /> Last revised 3/31 /03 01025-5 EAST GIFFORD <br /> RIPublic Works\Keithmstormwater Projects\Gifford East\Construction Contract\Technicai Specifications\Fnal Specifications\Division <br /> ' 1 \01025 - Measurement and Paynent.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.