Laserfiche WebLink
' material . <br /> Q . Item 2 . 09 — Stockpile Excess Topsoil and Excavated Material Per Specifications : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for hauling and stockpiling excess topsoil and excess excavated material . The <br /> ' lump sum payment includes , but is not limited to furnishing all labor, materials , <br /> tools , equipment, and transportation . Note : Indian River County will provide <br /> labor, equipment, and machinery necessary to spread and stockpile the <br /> material at the stockpile site . <br /> STRUCTURES <br /> ' R . Items 3 . 01 1029 30039 3 . <br /> 04 , and 3 . 05 [Miscellaneous Structures] : <br /> 1 . Measurement: The quantity of structures in -place will be the number furnished <br /> and installed as shown and specified on the Drawings . <br /> 2 , Payment : The unit price for each structure will be full compensation for <br /> furnishing all labor, materials and equipment for installation , including but not <br /> limited to , furnishing and installing structure , inlet frame and grate/cover, <br /> dewatering , excavation , bedding stone , temporary sheeting , pipe connections , <br /> ' PIPES backfill , compaction , and final grading to provide a complete installation . <br /> ' S . Items 4 . 01 , 4 . 029 4 . 03 , 4 . 04 , 4 . 05 , 4 . 062 4 . 07 , 4 . 089 4 . 099 4 . 10 , 4 . 11 , <br /> and 4 . 12 — <br /> [Miscellaneous Drainage Pipe] : <br /> 1 . Measurement: The quantity of drainage pipe in -place will be the number of <br /> linear feet of each size and type furnished and installed as shown on the <br /> Drawings . The lengths of pipe will be measured horizontally along the <br /> ' centerline of the completed pipe . <br /> 2 . Payment: The unit price per linear foot will be full compensation for all labor, <br /> materials , tools and equipment , including but not limited to clearing and <br /> ' grubbing ; trench excavation ; concrete jackets/sleeves and filter fabric , <br /> furnishing , installing , cleaning , and testing of pipe ; drainage and dewatering ; <br /> site restoration ; temporary sheeting , shoring and bracing ; restoration of <br /> unpaved areas ; pipe bedding ; backfill and compaction ; grading ; and protection <br /> of existing utilities and structures . <br /> ' T. Item 4 . 13 — Railroad Crossing — Jack and Bore with Steel Carrier Pipe & Steel <br /> Casing Pipe , complete : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for the bore and jack with steel carrier pipe and steel casing pipe in - place , <br /> furnished and installed as shown on the Drawings . The lump sum payment will <br /> be full compensation for furnishing all labor, materials , tools and equipment , <br /> Last revised 3/31 /03 01025-6 EAST GIFFORD <br /> R\Public Works\KeithM\Stormweter Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 1 \01 025 - Measurement and Paynent.doc <br />