My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Technical data , test reports , work schedules and any other information required by <br /> the authority having jurisdiction . <br /> C . Certificates : Certificate of Conformance in accordance with paragraph 21 . 1 of ASTM <br /> A139 . <br /> ' 1A PRODUCT DELIVERY , STORAGE , AND HANDLING <br /> A . Delivery <br /> 1 . Exercise special care during delivery not to damage the casing pipe or carrier <br /> pipe . <br /> ' 2 . Damaged materials will be rejected and will be replaced by the CONTRACTOR <br /> at its expense . <br /> 3 . Deliver materials to such locations so as to avoid excessive handling . <br /> ' B . Storage : <br /> 1 . Store casing pipe and carrier pipe on appropriate blocking for protection from <br /> ' corrosion until incorporation into the Work , in accordance with manufacturer's <br /> recommendation . <br /> 2 . Store in areas approved by the OWNER <br /> ' 3 . The OWNER shall be permitted access to inspect the materials in storage <br /> areas . <br /> ' C . Handling : <br /> 1 . Handle materials in a manner so as to avoid damage . <br /> 2 . Materials damaged during handling shall be repaired or replaced as ordered by <br /> the OWNER , at no expense to the OWNER . <br /> 1 . 5 GUARANTEE <br /> A . Guarantee of work completed b the CONTRACTOR shall be as specified in the <br /> p Y P <br /> ' General Conditions of these specifications , except that longer periods may be <br /> required where noted in the permits or specified by applicable authorities . <br /> PART 2 - MATERIALS <br /> 2 . 1 MATERIALS <br /> ' A . Steel Casing Pipe : <br /> 1 . Casing pipe shall be steel pipe meeting the requirements of ASTM A139 , Grade <br /> ' B , leak- proof construction , capable of withstanding AASHTO H &20 wheel <br /> loading for road crossings . Pipe shall be seamless or not have more than one <br /> longitudinal weld . <br /> ' Last revised 01 /25/2001 02250-3 EAST G I FFO RD <br /> RIPublic Works\Keithmstormweter Projects\Gifford East\Construction Contracnechnicai Specifications\nnai Specifications\Division <br /> ' 2\02250 - Crossings by Boring and Jacking .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.