My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
event of a conflict with FEC requirements and these specifications , the more <br /> stringent specification or requirement shall govern . <br /> ' 2 . The CONTRACTOR shall , in addition to 1 . 2 . 8 . 1 above , obtain all additional <br /> permits ( including payment of permit fees ) , provide insurance , bonds , and <br /> guarantees , and all else required by FEC and the local governing authorities at <br /> its own expense . The CONTRACTOR's responsibility underthis paragraph may <br /> include , but is not limited to the following : <br /> a . Constructing and removing temporary facilities or structures . <br /> b . Providing details of construction methods . <br /> C , Providing detailed construction schedules . <br /> d . Reimbursing the applicable authority for all expenses incurred by them in <br /> ' connection with the work. <br /> e . Traffic maintenance . <br /> f. Coordination of scheduling with the permitting authority . <br /> g . Necessary clean -up and restoration . <br /> 3 . Refer to Section 01040 , " Project Coordination , " paragraph 2 . 1 , for additional <br /> FEC coordination requirements . <br /> ' C . Tolerances : <br /> 1 . Install the casing pipe on the line and grade shown on the Plans and within <br /> tolerances required to allow the carrier pipe to be installed in accordance with <br /> the line and grade shown on the Plans . <br /> 2 . The maximum allowable tolerances are : <br /> ' a . Allowable Horizontal Tolerance : 0 . 50 feet . <br /> b . Allowable Vertical Tolerance : 0 . 25 feet . <br /> D . Reference Standards : <br /> 1 . ASTM A 139 , Electric- Fusion (ARC Welded ) Steel Pipe . <br /> 2 . AREA Chpt . 1 , Part 5 , "Specification for Pipelines Conveying Non - Flammable <br /> Substances . " <br /> 3 , AWS D1 . 1 , Structural Welding Code . <br /> 4 . State of Florida , Department of Transportation ( FDOT) Standards , Utility <br /> iAccommodation Guide , latest edition . <br /> 1 . 3 SUBMITTALS <br /> A . Installation Methods : For each cased crossing location , prepare a report containing <br /> ' drawings and descriptions of anticipated construction methods for installing the <br /> casing pipe and carrier pipe , dewatering methods , equipment , materials , jacking pit <br /> elevations , profile of proposed bores , etc . Submit three copies_ of the report to the <br /> ' ENGINEER . <br /> Last revised 01 /25/2001 02250-2 EAST GIFFORD <br /> RIPublic Wod s\KeithM\stormater Projects\Gifford East\construction Contracnechnical Specifications\Fnal Specifications\Division <br /> ' 2\02250 - Crossings by Boring and Jacking .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.