Laserfiche WebLink
5 . Repair, replace or take whatever action is deemed necessary by the OWNER to <br /> correct all disturbed joints at no additional cost to the OWNER . <br /> D . Bulkheads ( End Closure ) : <br /> 1 . After the carrier pipe is installed in the steel casing and successfully tested , seal <br /> ' the end of the pipe with cement grout as shown on the Plans and as specified <br /> herein . <br /> 2 . Prior to the installation of bulkheads , the carrier pipe shall be properly and <br /> sufficiently secured against flotation and against all movement that may disturb <br /> joints . <br /> a . The CONTRACTOR is responsible for all joints . <br /> b . Repair, replace , or take whatever action is deemed necessary by the <br /> OWNER to correct all disturbed joints at no additional expense to the <br /> OWNER . <br /> ' E . Dewatering : <br /> 1 . Dewatering shall be performed in accordance with the criteria specified in <br /> Sections 02220 and 02225 . <br /> + + END OF SECTION + + <br /> Last revised - <br /> 01 /25/2001 02250 6 EAST GIFFORD <br /> FAPublic Works\KeithM\stormmter Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 2\02250 - Crossings by Boring and Jacking.doc <br />