My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01040 <br /> ' PROJECT COORDINATION <br /> ' 1 . 1 SCOPE <br /> A . CONTRACTOR shall be solely responsible for coordination ( including scheduling ) <br /> t of all of the work to insure completion of the Work within the Contract Time . <br /> Supervise , direct and cooperate fully with all subcontractors , manufacturers , <br /> fabricators , suppliers , distributors , installers , testing agencies and all others whose <br /> services , materials or equipment are required , including the work of any other <br /> contractor, utility service company or OWNER'S employees performing additional <br /> work related to the Project at the site . <br /> C . Maintain sufficient competent personnel , drafting equipment and supplies for the <br /> purpose of preparing layout and coordination drawings . These drawings shall <br /> supplement the Contract Documents , working drawings , and Shop Drawings as <br /> necessary, to correlate the work of various trades . Where such drawings are to be <br /> prepared by Subcontractors , ensure that each Subcontractor maintains the required <br /> personnel and facilities : <br /> D . Attend and participate in all project meetings and report on the progress of all work <br /> and compliance with schedules . <br /> 2 . 1 COORDINATION WITH FLORIDA EAST COAST RAILWAY COMPANY L . L . C . <br /> A . At least five days before entering onto Railway property , schedule a Florida East <br /> Coast Railway Company, L . L . C . ( FEC ) flagman/watchman by calling Mr. Charles <br /> Stone of the FEC Engineering Department at ( 904 ) 826-2369 . <br /> B . Locate FEC Railway' s signal and train control cables by calling the FEC Signal <br /> Department at (904 ) 826-2377 . <br /> C . Submit a Certificate of Insurance to Mr. M . O . Bagley, Director of Industrial <br /> Development and Real Estate , Florida East Coast Railway Company , L . L . C . , One <br /> Malaga Street , St , Augustine , Florida 32084 , naming the FEC as an additional <br /> insured . Refer to the " Indemnity of Florida East Coast Railway , L . L . C . and <br /> Insurance Requirements , " in Appendix A, for details . <br /> D . Several communication companies have installed a fiber optic communications <br /> system within the FEC Railway property. Before performing any work on FEC <br /> Last revised 9/6/02 01040- 1 <br /> EAST GIFFORD <br /> RIPublic Works\Keithmstonrnmeter Projects\(afford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 1 \01040 - Project coordination .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.