My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Railway "SUNSHINE "property, call SUNSHINE at 1 -8004324770 to notify those companies <br /> and other companies who may have utilities buried in the FEC Railway property . <br /> 2 . 2 COORDINATION WITH THE FEDERAL AVIATION ADMINISTRATION <br /> A. At least ten working days before commencing construction , coordinate all <br /> construction activities with the Federal Aviation Administration via Mr. Ericson W . <br /> Menger, Airport Director, City of Vero Beach , (561 ) 56745267 City of Vero Beach <br /> I Municipal Airport, <br /> B . If cranes will be used during construction , notify City of Vero Beach Airport staff a <br /> ' minimum of 72 hours in advance to allow the City to issue a Notice to Airmen . <br /> 2 . 3 COORDINATION WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION <br /> A . Are- <br /> p construction conference with the Florida Department of Transportation ' s <br /> ( FDOT) project engineer must be held before performing construction work in FDOT <br /> right-of-way. If possible , this meeting will be included in the regular pre-construction <br /> meeting scheduled by the ENGINEER . Otherwise , the CONTRACTOR shall <br /> schedule the meeting . <br /> B . Prepare and discuss an emergency restoration plan to address eventualities such <br /> ' as hurricanes . <br /> C . Provide FDOT' s project engineer with an emergency 24-hour telephone number. <br /> D . Notify local law enforcement agencies before closing one or more lanes of the State <br /> highway system for periods exceeding two hours . <br /> tE . Safely conduct the public through the permitted work area from the time the work <br /> begins to the time of final completion . Fully comply with these Specifications and <br /> 1 FDOT' s Roadway and Traffic Design Standards (600 Series ) ; in the event of a <br /> conflict , the more stringent specification or requirement shall govern . <br /> F . Contact Jim Decaro of FDOT 48 hours in advance of beginning work in FDOT <br /> right-of-way. Telephone number = (772 ) 465-7396 , Fax number = ( 772 ) 489 - <br /> 7120 . <br /> ' + + END OF SECTION + + <br /> 1 <br /> ' Last revised 9/6/02 01040-2 <br /> EAST GIFFORD <br /> RIPublic Works\Keithmstorm%ater Projects\Afford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> 1 \01040 - Project Coordination .doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.