Laserfiche WebLink
' SECTION 01045 <br /> CUTTING AND PATCHING <br /> 1 . 1 GENERAL <br /> 1 A <br /> This section Includes all cutting and patching of all Work under construction , <br /> completed Work and existing facilities in order to accommodate the coordination <br /> of Work , install other Work , uncover Work for access , inspection or testing , or <br /> similar purposes . " Demolition Work" is specified elsewhere . Execute all cutting <br /> ' and patching , including excavation , backfill and fitting required to : <br /> 1 . Remove and replace defective Work or Work not conforming to <br /> requirements of the Contract Documents . <br /> 2 . Remove samples of installed Work as required for testing . <br /> 3 . Remove all construction required to provide for the specified alteration or <br /> addition to existing Work . <br /> 4 . Uncover Work to provide for the ENGINEER ' s inspection of covered Work <br /> or inspection by regulatory agencies having jurisdiction . <br /> 5 . Connect to completed Work that was not accomplished in the proper <br /> sequence . <br /> 6 . Remove or relocate existing utilities and pipes , which obstruct the Work to <br /> which connections must be made . <br /> 7 . Make connections or alterations to existing or new facilities . <br /> ' B . Restore all existing work to a state equal to that which it was in prior to cutting <br /> and restore new Work to the standards of these Specifications . <br /> C . Submittals : <br /> 1 . Prior to any cutting which may affect the integrity and design function of the <br /> Project , OWNER ' s operations , or work of another contractor, submit written <br /> ' notice to the ENGINEER , requesting consent to proceed with the cutting . <br /> The request shall include : <br /> a . Identification of Project . <br /> b . Description of affected work of CONTRACTOR and work of others . <br /> C , Necessity for cutting . <br /> d . Effect on other work and on structural integrity of Project . <br /> e . Description of proposed work . Designate : <br /> 1 ) Scope of cutting and patching . <br /> ' 2 ) CONTRACTOR , Subcontractor or trade to execute the work . <br /> 3 ) Products proposed to be used . <br /> 4) Extent of refinishing . <br /> 5 ) Schedule of operations . <br /> 1 Last revised 7/ 17/01 01045- 1 EAST GIFFORD <br /> FAPublic WorksWeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01045 - Cutting <br /> ' & Patching .doc <br />