Laserfiche WebLink
1 f. Alternatives for cutting and patching , if any , <br /> g . Designation of party responsible for cost of cutting and patching . <br /> 2 . Should conditions of Work , or schedule , indicate change of materials or methods , <br /> submit written recommendation to ENGINEER, including : <br /> a . Conditions indicating change . <br /> b . Recommendations for alternative materials or methods . <br /> C, Submittals are required for substitutions . <br /> 3 . Submit written notice to the ENGINEER , designating the time the Work will be <br /> uncovered , to provide for observation . Do not begin cutting or patching operations <br /> until authorized by the ENGINEER. <br /> ' E . Provide shoring , bracing and support as required to maintain the structural integrity of <br /> the Project and protect adjacent Work from damage during cutting and patching . <br /> F . Conform to all applicable Specifications for application and installation of materials used <br /> for patching . <br /> G . Obtain all required permits . <br /> + + END OF SECTION + + <br /> Last revised 7/ 17/01 01045-2 <br /> EAST GIFFORD <br /> RIPublic Works\Keithmstorrnwater Projects\Gifford East\Construction Contrach7rechnical SpecificationsTivision 1 \01045 - Cutting <br /> ' & Patching .doc <br />