My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01050 <br /> ' SURVEYING AND FIELD ENGINEERING SERVICES <br /> 1 . 1 GENERAL <br /> A. Provide civil , structural or other professional engineering services specified or <br /> required , to execute the CONTRACTOR's construction methods . <br /> B . Develop and make all detail surveys and measurements needed for construction <br /> ' including but not limited to , slope stakes , batter boards , piling layouts and all other <br /> working lines , elevations and cut sheets . <br /> Co Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work . <br /> ' D . Provide all material required for benchmarks , control points , batter boards , grade <br /> stakes , and other items . <br /> ' E . Be solely responsible for all locations , dimensions and levels . No data other than <br /> written orders of the ENGINEER shall justify departure from the dimensions and <br /> levels required by the Drawings . <br /> F . Safeguard all points , stakes , grademarks , monuments and benchmarks made or <br /> established on the Work, and reestablish same if disturbed . Rectify all Work <br /> 1 improperly installed because of not maintaining , not protecting or removing without <br /> authorization such established points , stakes , marks and monuments . <br /> 1 G . When requested by the ENGINEER , provide such facilities and assistance as may <br /> be necessary for the ENGINEER to check line and grade points placed by the <br /> CONTRACTOR. Do no excavation or embankment work until all cross-sectioning <br /> necessary for determining pay quantities has been completed and checked by the <br /> ENGINEER . <br /> ' 1 . 3 CONTRACTOR' S FIELD ENGINEER/SUPERINTENDENT <br /> A. Employ and retain at the site of the Work, a field engineer and/or superintendent <br /> 1 capable of performing all engineering tasks required of the CONTRACTOR . <br /> These tasks include , but are not limited to : <br /> 1 . If requested by the ENGINEER , by 4 : 00 p . m . on each workday, prepare and <br /> submit to the ENGINEER , a list of work to be completed the following day. <br /> The projection shall include : <br /> Last revised 5/29/02 01050- 1 EAST GIFFORD <br /> FAPublic WorksWeithM\Stormwiter Projects\Gifford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> 1 \01050 - Feld <br /> ' Engineering .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.