My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a . Location of all areas in which construction will be done (including <br /> Subcontractors ) . <br /> ' b . Major construction equipment utilized . <br /> c . Equipment and materials to be installed . <br /> 2 . Check all formwork, reinforcing , inserts , structural steel , bolts , sleeves , piping , <br /> other materials and equipment. <br /> 3 . Maintain office files and drawings , Record Documents , and coordinate all work <br /> with Subcontractors . Prepare layout and construction drawings for <br /> construction operations . <br /> 4 . Check and coordinate the Work for conflicts and interferences and <br /> ' immediately advise the ENGINEER in writing , of all discrepancies noted . <br /> 5 . Coordinate with the ENGINEER in field inspections . <br /> 1 . 3 SURVEY WORK <br /> A . Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions in the survey data . The commencing of any of the work <br /> by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all <br /> survey or existing site information is correct and accurate , it any reasonably <br /> inferable errors , inaccuracies or omissions . <br /> ' B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> reference points and property corners and will be responsible for any mistake or <br /> loss of time caused by their unnecessary loss or disturbance . If the loss or <br /> disturbance of any stakes or marks cause a delay in the Work, the CONTRACTOR <br /> shall have no claim for damages or extension of time . Control stakes , <br /> benchmarks , reference points and property corners disturbed by the <br /> CONTRACTOR's work shall be replaced by a Florida Registered Land Surveyor <br /> and 1 Mapper, at the CONTRACTOR's expense . If the OWNER must provide the services of the Florida Registered Surveyor and <br /> Mapper to perform this <br /> replacement work, the cost of the surveying services will be deducted from any <br /> sums due the CONTRACTOR for the work performed under this Contract. <br /> C . All construction survey work shall be performed under the guidance and direction <br /> of a Florida Registered Surveyor and Mapper. <br /> D . All survey work for Record Drawings shall be performed under the guidance and <br /> direction of a Florida Registered Surveyor and Mapper. <br /> ' E . Maintain a complete , accurate log of all control and survey as work it progresses . <br /> ' Last revised 5/29/02 01050-2 EAST GIFFORD <br /> FAPublic WorksVeithM\StormHeter ProjectsMord East\Construction ContrachTechnical Specifications\Final Specifications\Division <br /> 1 \01050 - Feld <br /> Engineering.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.