My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01220 <br /> ' <br /> 1 . 1 SCOPE PROGRESS MEETINGS <br /> ' A. Date and Time : As mutually agreed upon by ENGINEER and CONTRACTOR . <br /> ' Be Place : ENGINEER's office or other mutually agreed upon location . <br /> C . ENGINEER shall prepare agenda , preside at meetings , and prepare and distribute <br /> ' a transcript of proceedings to all parties . <br /> D . CONTRACTOR shall provide data required and be prepared to discuss all agenda <br /> items . <br /> E . Representatives present for each party shall be authorized to act on their behalf. <br /> i 1 . 2 MINIMUM ATTENDANCE <br /> A. CONTRACTOR: <br /> 1 . When needed for the discussion of a particular agenda item , require <br /> representatives of Subcontractors or suppliers to attend the meeting . <br /> ' Be ENGINEER . <br /> ' C . OWNER's representative . <br /> 1 . 3 AGENDA <br /> A. Agenda will include , but will not necessarily be limited to , the following: <br /> 1 . Transcript of previous meeting . <br /> ' 2 . Progress since last meeting . <br /> 3 . Planned progress for next period . <br /> 4 . Problems , conflicts and observations . <br /> 5 . Change Orders . <br /> 6 . Status of Shop Drawings . <br /> 7 . Quality standards and control . <br /> ' 8 . Schedules , including off-site fabrication and delivery schedules . Corrective <br /> measures , if required . <br /> 9 . Coordination between parties . <br /> 10 . Safety concerns . <br /> 11 . Other business . <br /> + + END OF SECTION + + <br /> Last revised 5/29/02 01220- 1 EAST GIFFORD <br /> ' FAPublic Works\KeithM\Stormvater ProjectsMord East\Construction ContrachTechnical Specifications\Final Specifications\Division <br /> 1 \01 220 - Progress Meetings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.