Laserfiche WebLink
SECTION 01330 <br /> REQUIRED SUBMITTALS <br /> ' 1 . 1 GENERAL <br /> A . Submit Record Drawings , photographs and video tapes , pay requests , <br /> change orders , construction schedules , etc. , as required or inferred by these <br /> Contract Documents , <br /> 1 . 2 DESCRIPTION OF REQUIREMENTS <br /> A . The individual submittal requirements are specified in the applicable section <br /> for each unit of work. <br /> 1 . Unless otherwise noted , submit each item of work-related submittal to <br /> the ENGINEER for review prior to construction or installation . The <br /> ENGINEER' s review of work-related submittals is for general <br /> conformance with the design concept and the Contract Documents . <br /> Be Definitions : The work-related submittals of this section , in addition to the <br /> definitions of the General Conditions and elsewhere in the Contract <br /> Documents , are defined as follows : <br /> 1 . Shop Drawings include custom- prepared data of all forms including <br /> drawings , diagrams , performance curves , data sheets , schedules , <br /> templates , patterns , reports , calculations , instructions , measurements <br /> ' and similar information not in standard printed form applicable to <br /> other projects . Refer to Section 01340 for specific general <br /> requirements for Shop Drawings . <br /> ' 2 . Product data include standard printed information on materials , <br /> products and systems ; not custom-prepared for this project, other <br /> than the designation of selections from available choices . <br /> 3 . Samples include both fabricated and unfabricated physical examples <br /> of materials , products and work; both as complete units and as <br /> smaller portions of units of work; either for limited visual inspection or <br /> ' (where indicated ) for more detailed testing and analysis . <br /> C . Miscellaneous submittals related directly to the work ( non -administrative ) <br /> ' include warranties , guarantees , maintenance agreements , workmanship <br /> bonds , project photographs/videos , survey data and reports , physical work <br /> records , statement of applicability, quality testing and certifying reports , <br /> ' copies of industry standards , record drawings , operating and maintenance <br /> materials , overrun stock, security/protection/safety keys and similar <br /> information , devices and materials applicable to the work and not defined as <br /> ' Last revised 5/30/02 <br /> 01330- 1 EAST GIFFORD <br /> FAPublic Worksveithmstormweter Projects\Gitford East\Construction Contract\Technical Specifications0raft Specifications0vision <br /> ' 1 \01330 - Required Submittals.doc <br />