My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' shopdrawings , product g , p data or samples . <br /> ' 1 . 3 GENERAL SUBMITTAL REQUIREMENTS <br /> A. Coordination and Sequencing : Coordinate the preparation and processing of <br /> ' submittals with the performance of the work so that work will not be delayed <br /> by submittals . Coordinate and sequence different categories of submittals <br /> ' for the same work, and for interfacing units of work , so that one will not be <br /> delayed for coordination with another. No extension of time will be allowed <br /> because of failure to properly coordinate and sequence submittals . Do not <br /> ' proceed with purchasing , fabrication and delivery of work related to a <br /> submittal until the submittal procedure has been successfully completed . <br /> Be Preparation of Submittals : Provide permanent marking on each submittal to <br /> identify it by project, date , Contractor, subcontractor, submittal name and <br /> similar information to distinguish it from other submittals . Show <br /> ' CONTRACTOR' s approval marking and provide space for review marking . <br /> Package each submittal appropriately for transmittal and handling . <br /> Submittals which are received from sources other than the CONTRACTOR's <br /> ' office will be returned without review. <br /> 1 .4 SPECIFIC CATEGORY SUBMITTAL REQUIREMENTS : WORK- RELATED AND <br /> MISCELLANEOUS SUBMITTALS <br /> A. General : Except as otherwise indicated in individual work sections , comply <br /> ' with the general requirements specified for each indicated category of <br /> submittal . Provide and process intermediate submittals (where required <br /> between initial and final ) similar to initial submittals . <br /> ' Be Shop Drawings : Provide newly-prepared information , show dimensions and <br /> note those based on field measurements , identify materials and product in <br /> ' the work shown , indicate compliance with standards and special coordination <br /> requirements . Do not allow shop drawing copies without appropriate final <br /> review markings by the ENGINEER to be used in connection with the work. <br /> ' Submit shop drawings as outlined in Section 01340 of these specifications . <br /> C . Product Data : Collect the required data into one submittal for each material , <br /> ' product or system ; and mark each copy to show which choices and options <br /> are applicable to the project. Include manufacturer' s standard printed <br /> recommendations for application and use , compliance with standards , <br /> application of labels and seals , notation of field measurements which have <br /> been checked , and special coordination requirements . Maintain one set of <br /> product data for each submittal at the project site , available for reference by <br /> Last revised 5/30/02 01330-2 <br /> EAST GIFFORD <br /> FAPublic Works\Keithmstorm oter Projects\Gfford East\construction contract\Technical Specifications0raft SpecificationsUvision <br /> ' 1 \01330 - Required Submittals.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.