' shopdrawings , product g , p data or samples . <br /> ' 1 . 3 GENERAL SUBMITTAL REQUIREMENTS <br /> A. Coordination and Sequencing : Coordinate the preparation and processing of <br /> ' submittals with the performance of the work so that work will not be delayed <br /> by submittals . Coordinate and sequence different categories of submittals <br /> ' for the same work, and for interfacing units of work , so that one will not be <br /> delayed for coordination with another. No extension of time will be allowed <br /> because of failure to properly coordinate and sequence submittals . Do not <br /> ' proceed with purchasing , fabrication and delivery of work related to a <br /> submittal until the submittal procedure has been successfully completed . <br /> Be Preparation of Submittals : Provide permanent marking on each submittal to <br /> identify it by project, date , Contractor, subcontractor, submittal name and <br /> similar information to distinguish it from other submittals . Show <br /> ' CONTRACTOR' s approval marking and provide space for review marking . <br /> Package each submittal appropriately for transmittal and handling . <br /> Submittals which are received from sources other than the CONTRACTOR's <br /> ' office will be returned without review. <br /> 1 .4 SPECIFIC CATEGORY SUBMITTAL REQUIREMENTS : WORK- RELATED AND <br /> MISCELLANEOUS SUBMITTALS <br /> A. General : Except as otherwise indicated in individual work sections , comply <br /> ' with the general requirements specified for each indicated category of <br /> submittal . Provide and process intermediate submittals (where required <br /> between initial and final ) similar to initial submittals . <br /> ' Be Shop Drawings : Provide newly-prepared information , show dimensions and <br /> note those based on field measurements , identify materials and product in <br /> ' the work shown , indicate compliance with standards and special coordination <br /> requirements . Do not allow shop drawing copies without appropriate final <br /> review markings by the ENGINEER to be used in connection with the work. <br /> ' Submit shop drawings as outlined in Section 01340 of these specifications . <br /> C . Product Data : Collect the required data into one submittal for each material , <br /> ' product or system ; and mark each copy to show which choices and options <br /> are applicable to the project. Include manufacturer' s standard printed <br /> recommendations for application and use , compliance with standards , <br /> application of labels and seals , notation of field measurements which have <br /> been checked , and special coordination requirements . Maintain one set of <br /> product data for each submittal at the project site , available for reference by <br /> Last revised 5/30/02 01330-2 <br /> EAST GIFFORD <br /> FAPublic Works\Keithmstorm oter Projects\Gfford East\construction contract\Technical Specifications0raft SpecificationsUvision <br /> ' 1 \01330 - Required Submittals.doc <br />