My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br /> ' SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> ' A . Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the <br /> ENGINEER immediately . The Work will not be accepted by the OWNER until final <br /> acceptance has been received from the various Regulatory Agencies having <br /> 1 jurisdiction . <br /> B . Furnish sufficient labor, construction equipment and materials , and work such <br /> ' hours , including night shifts and overtime operations , as may be necessary to insure <br /> the prosecution of the work in accordance with the approved progress schedule . If, <br /> in the opinion of the ENGINEER , the CONTRACTOR falls behind the progress <br /> schedule , take such steps as may be necessary to improve progress , all without <br /> additional cost to the OWNER . <br /> 1 . Failure to comply with the requirements of the ENGINEER under this <br /> provision shall be grounds for determination by the ENGINEER that the <br /> CONTRACTOR is not prosecuting the work with such diligence as will insure <br /> completion within the time specified . Upon such determination , the <br /> 1 ENGINEER may recommend to the OWNER to seek such legal remedy as is <br /> deemed necessary to protect the OWNER's interest . <br /> ' C . All salvageable material and equipment for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and ' shall <br /> be delivered to the OWNER at the following location : the Indian River County Road <br /> ' and Bridge Facility at 4550 41st Street , Vero Beach , at the CONTRACTOR' s <br /> expense . All material and equipment not in salvageable condition , as determined <br /> bythe ENGINEER and the OWNER , shall be disposed of bythe CONTRACTOR , at <br /> 1 the CONTRACTOR's expense . <br /> 1 <br /> D . Requirements of Permits or Grants : In addition to these Specifications , all work shall comply with the requirements of local <br /> permitting agencies , St . Johns River Water <br /> ' Management District, Florida Department of Environmental Protection , Florida <br /> Department of Transportation , and all other state or federal agencies ' permit or <br /> grant requirements . If there is a conflict between the Specifications and any permit <br /> or grant requirement , then the most stringent specification or requirement shall <br /> govern . In any event , the ENGINEER shall determine which specification or <br /> ' requirement governs , and the ENGINEER ' s decision shall be final . <br /> E . Other Specifications and Requirements : In some instances , the Specifications <br /> Last revised 9/6/02 01009- 1 <br /> EAST GIFFORD <br /> FAPublic Works\KeithM\storm ater Projects\Cifford East\construction contractnechnical Specifications\Final Specifications\Division <br /> ' 1 \01 009 - special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.