Laserfiche WebLink
contained herein may refer <br /> y to other requirements or specifications (such as FDOT' s <br /> Standard Specifications for Road and Bridge Construction ) . If there is a conflict <br /> ' between the Specifications and any referenced specification or requirement , then <br /> the most stringent specification or requirement shall govern . In any event, the <br /> ENGINEER shall determine which specification or requirement governs , and the <br /> ' ENGINEER' s decision shall be final . <br /> F . Notify all permitting agencies of intention to begin construction . Give proper <br /> notification within the time frame required by the agency. <br /> G . Give the ENGINEER ten ( 10 ) days minimum notice before beginning work on the <br /> Project . <br /> H . Give the ENGINEER a minimum of 48 hours notice before performing any test . <br /> I . Before performing any work outside the designated limits of the work site , secure <br /> any necessary permits and authorization from the applicable owner, or verify in <br /> writing that such has been previously obtained . Follow all requirements of any said <br /> permits or authorization . Give the ENGINEER and appropriate ownerten ( 10 ) days <br /> minimum notice before commencing construction operations outside the designated <br /> limits of the work site . <br /> J . Do not work overtime unless authorized to do so by OWNER . If overtime is <br /> required , provide 48 hours minimum notice to the ENGINEER . <br /> ' K . Do not perform any work on holidays or weekends that requires inspection by <br /> the ENGINEER or OWNER , without first obtaining the OWNER 's written <br /> permission . <br /> L . Do not start any work that involves modification to existingfacilities ,, until written <br /> approval and authorization has been received from the OWNER or his designated <br /> representative . When written approval and authorization has been received , give <br /> the OWNER a minimum of 48 hours advance notice before starting any work that <br /> involves modifications to existing facilities . <br /> M . Anything mentioned in the Specifications and not shown in the Drawings , or shown <br /> in the Drawings and not mentioned in the Specifications , shall be of like effect as if <br /> shown or mentioned in both . <br /> + + END OF SECTION + + <br /> ' Last revised 9/6/02 01009-2 <br /> EAST GIFFORD <br /> RIPublic Works\Keithmstormmter Projects\Gifford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> 1 \0 1009 - Special Provisions.doc <br />