Laserfiche WebLink
1 <br /> 1 SECTION 01010 <br /> SUMMARY OF WORK <br /> 1 . 1 GENERAL <br /> A . The summary of the Work described in this Section is an overall summary of <br /> the responsibilities of the CONTRACTOR and his relation to the OWNER . <br /> 1 . 2 LOCATION OF WORK <br /> B . The <br /> proposed work is approximately located south of 43rd Street , north of <br /> South Gifford Road ' s (41 st Street) south right-of-way, west of U . S . Highway <br /> No . 1 , and east of the Indian River Farms Water Control District boundary . <br /> 1 . 3 WORK TO BE DONE <br /> A . To determine the full scope of the project or any particular part of the project , <br /> coordinate the applicable information in the various parts of these Contract <br /> Documents . A brief summary of the project follows : <br /> The Contractor shall construct a stormwater collection , conveyance , <br /> 1 and detention system (6 ± acre wet pond ) in a poorly drained area <br /> west of the Florida East Coast Railroad track . It shall also construct a <br /> stormwater collection and conveyance system in the western right-of- <br /> way of U . S . Highway No . 1 . Stormwater runoff will drain into concrete <br /> drainage structures and it will be conveyed by concrete pipe . The <br /> Work also includes a bore and jack underneath the railroad track . <br /> The project is in the vicinity of the City of Vero Beach Municipal <br /> Airport and will be regulated by the Federal Aviation Authority . Other <br /> permitting authorities include St . Johns River Water Management <br /> District and the Florida Department of Transportation . <br /> B . Furnish all the labor, materials , equipment , tools , plant , supervision , <br /> 1 transportation , safety control , traffic control , services , incidentals , etc , to <br /> complete all of the work in a first-class workmanlike manner as required by <br /> the Contract Documents to the full and complete satisfaction of the Owner. <br /> All work shall be performed by craftsmen skilled in their trade . <br /> C . Work shall include all repairs , replacements and restoration required as a <br /> ' result of damages caused during the construction process . <br /> D . Furnish and install all materials , equipment and labor which are reasonably <br /> iLast revised 2/ 18/03 01010- 1 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormmter Projects\Gifford East\Construction ContrachTechnical Specifications\Fnal Specifications\Division <br /> 1 \01010 - Summary of the <br /> ' Work.doc <br />