My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 E . All submittals shall bear the stamp pp 9 of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR . Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR . <br /> F . Assign a number to each Submittal starting with No . 1 and thence <br /> numbered consecutively. Identify resubmittals by the original submittal <br /> number followed by the suffix "A" for the first resubmittal , the suffix " B " for <br /> ithe second resubmittal , etc . <br /> G . Initially submit to ENGINEER a minimum of six (6 ) copies of all submittals <br /> ' that are on 11 -inch by 17- inch or smaller sheets ( no less than 8 1 /2 - inch x <br /> 11 - inch ) , and one unfolded sepia and 2 prints made from that sepia for all <br /> submittals on sheets larger than 11 - inch by 17- inch . <br /> H . After ENGINEER completes his review , Shop Drawings well be marked <br /> with one of the following notations : <br /> 1 . Approved <br /> 2 . Approved as Corrected <br /> 3 . Approved as Corrected - Resubmit <br /> 4 . Revise and Resubmit <br /> 5 , Not Approved <br /> I . If a submittal is acceptable , it will be marked "Approved " or "Approved as <br /> Corrected " . Three ( 3 ) prints or copies of the submittal will be returned to <br /> ' CONTRACTOR . <br /> J . Upon return of a submittal marked "Approved " or "Approved as <br /> Corrected " , CONTRACTOR may order, ship or fabricate the materials <br /> included on the submittal , provided it is in accordance with the corrections <br /> indicated . <br /> ' K . If a Shop Drawing marked "Approved as Corrected " has extensive <br /> corrections or corrections affecting other drawings or Work , ENGINEER <br /> may require that CONTRACTOR make the corrections indicated thereon <br /> and resubmit the Shop Drawings for record purposes . Such drawings will <br /> have the notation , "Approved as Corrected - Resubmit . " <br /> ' L . If a submittal is unacceptable , three (3 ) copies will be returned to <br /> CONTRACTOR with one of the following notations : <br /> 1 . " Revise and Resubmit' <br /> 2 . " Not Approved " <br /> Last revised 7/17/01 01340-5 EAST GIFFORD <br /> FAPublic Works\KeithM\Storm\Aater Projects\Gfford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 1 \01340 - Submittal of Shop Drawings , Product Data, and Samples .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.