' M . Upon return of a submittal marked " Revise and Resubmit" make <br /> p the <br /> corrections indicated and repeat the initial approval procedure . The " Not <br /> ' Approved " notation is used to indicate material or equipment that is not <br /> acceptable . Upon return of a submittal so marked , repeat the initial <br /> ' approval procedure utilizing acceptable material or equipment . <br /> N . Any related Work performed or equipment installed without an "Approved " <br /> ' or "Approved as Corrected " Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR . <br /> ' O . Submit Sop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved . CONTRACTOR shall assume the risk for all materials or <br /> equipment which are fabricated or delivered prior to the approval of Shop <br /> Drawings . Materials or equipment will not be included in periodic progress <br /> ' payments until approval thereof has been obtained in the specified <br /> manner. <br /> ' P . ENGINEER will review and process all submittals promptly , but a <br /> reasonable time should be allowed for this , for the Shop Drawings being <br /> revised and resubmitted , and for time required to return the approved <br /> Shop Drawings to CONTRACTOR . <br /> Q . Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals . All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings , Samples or other items requiring approval , will be backcharged <br /> ' to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions . If the CONTRACTOR requests a substitution <br /> for a previously approved item , all of ENGINEER' S costs in the reviewing <br /> and approval of the substitution will be backcharged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR . <br /> R . Close Out Submittals : Refer to Section 1810 for specific general <br /> requirements on the submittal of closeout information , materials , tools , <br /> ' and similar items . <br /> + + END OF SECTION + + <br /> 1 Last revised 7/ 17/01 01340-6 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gfford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> ' 1 \01340 - Submittal of Shop Drawings, Product Data , and Samples .doc <br />